A platform for research: civil engineering, architecture and urbanism
Construction method and construction equipment for static pressure immersed tubular pile
The invention discloses a construction method and construction equipment for a static pressure immersed tubular pile. The construction method comprises the steps of taking in place and immersing a tube, wherein the tube immersing method comprises the steps of starting a pressurized static pressure system and a tube immersing system of piling equipment, interactively pressurizing an outer tube andan inner tube, and immersing the tube immersing system to a set depth; the pressurized static pressure system comprises a hollow vertical frame arranged on a chassis of a static pressure pile machine,a group of hydraulic holding pressure pile clamping devices arranged on the chassis and a group of hydraulic holding pressure pile clamping devices arranged on the vertical frame; and the tube immersing system comprises a steel outer tube with set rigidity and strength and an inner tube hammer system with set rigidity and strength. The construction method has the advantages of convenience in construction and good construction effect.
本发明公开了一种静压沉管桩的施工方法及施工设备,包括就位、沉管步骤,沉管方法包括:启动桩工设备的加压静压系统及沉管系统,交互加压外管、内管,将沉管系统下沉至设定深度;加压静压系统包括静压桩机底盘上设置的空心立架、底盘上设置的一组液压抱压夹桩器、立架上设置的一组液压抱压夹桩器;沉管系统包括设定刚度强度的钢外管和设定刚度强度的内管锤系统。本发明施工方便,施工效果好。
Construction method and construction equipment for static pressure immersed tubular pile
The invention discloses a construction method and construction equipment for a static pressure immersed tubular pile. The construction method comprises the steps of taking in place and immersing a tube, wherein the tube immersing method comprises the steps of starting a pressurized static pressure system and a tube immersing system of piling equipment, interactively pressurizing an outer tube andan inner tube, and immersing the tube immersing system to a set depth; the pressurized static pressure system comprises a hollow vertical frame arranged on a chassis of a static pressure pile machine,a group of hydraulic holding pressure pile clamping devices arranged on the chassis and a group of hydraulic holding pressure pile clamping devices arranged on the vertical frame; and the tube immersing system comprises a steel outer tube with set rigidity and strength and an inner tube hammer system with set rigidity and strength. The construction method has the advantages of convenience in construction and good construction effect.
本发明公开了一种静压沉管桩的施工方法及施工设备,包括就位、沉管步骤,沉管方法包括:启动桩工设备的加压静压系统及沉管系统,交互加压外管、内管,将沉管系统下沉至设定深度;加压静压系统包括静压桩机底盘上设置的空心立架、底盘上设置的一组液压抱压夹桩器、立架上设置的一组液压抱压夹桩器;沉管系统包括设定刚度强度的钢外管和设定刚度强度的内管锤系统。本发明施工方便,施工效果好。
Construction method and construction equipment for static pressure immersed tubular pile
一种静压沉管桩的施工方法及施工设备
ZHU JIANXIN (author) / JIN BO (author) / BAO HUA (author) / YAO FENGXIANG (author)
2021-01-19
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Static pressure immersed tube compaction pile side pile construction method
European Patent Office | 2020
|Construction method of static pressure immersed tube pile and static pressure pile planting machine
European Patent Office | 2023
|PHC tubular pile static pressure equipment with buffering function and construction method thereof
European Patent Office | 2023
|Construction method and construction equipment for immersed tube pedestal pile
European Patent Office | 2022
|