A platform for research: civil engineering, architecture and urbanism
Installation and construction process of heat preservation and insulation integrated wall
The invention relates to an installation and construction process of a heat preservation and insulation integrated wall. According to the installation and construction process of the heat preservationand insulation integrated wall, the following integrated wall construction device is adopted, and the integrated wall construction device comprises a bottom plate, a sliding rod, a sliding seat, a telescopic plate, a glue brushing mechanism and a guide bracket. The installation and construction process of the heat preservation and insulation integrated wall adopting the integrated wall construction device comprises the following steps of (S1) cleaning the wall; (S2) positioning the bottom plate; (S3) preparing for gluing on the wall; and (S4) gluing the wall. The installation and constructionprocess aims to solve the problems that when an existing integrated wall body is installed, a gluing area of the integrated wall body cannot be effectively controlled, the difficulty of manual gluingon the wall is large, glue liquid on a gluing roller can drop on an installed integrated wallboard, the decorative surface of the integrated wallboard is influenced and damaged when the surface of the wallboard is cleaned, the gluing amount of the integrated wallboard cannot be effectively controlled, and the degree of attaching compactness of the integrated wallboard is influenced.
本发明涉及一种保温隔热集成墙面安装施工工艺,该保温隔热集成墙面安装施工工艺采用如下集成墙面施工装置,集成墙面施工装置包括底板、滑动杆、滑动座、伸缩板、刷胶机构和导向支架;采用上述集成墙面施工装置对保温隔热集成墙面的安装施工工艺,包括以下步骤:S1、墙面清理;S2、底板定位;S3、墙面刷胶准备;S4、墙面刷胶。本发明可以解决现有针对集成墙体安装时存在的:集成墙体的刷胶区域无法得到有效控制,且人工对墙面进行刷胶操作难度大,刷胶辊上的胶液会滴在已安装好的集成墙板上,造成墙板的表面进行清理时影响集成墙板的装饰面发生损坏;集成墙板的刷胶量无法进行有效控制,影响集成墙板的贴合密实程度等问题。
Installation and construction process of heat preservation and insulation integrated wall
The invention relates to an installation and construction process of a heat preservation and insulation integrated wall. According to the installation and construction process of the heat preservationand insulation integrated wall, the following integrated wall construction device is adopted, and the integrated wall construction device comprises a bottom plate, a sliding rod, a sliding seat, a telescopic plate, a glue brushing mechanism and a guide bracket. The installation and construction process of the heat preservation and insulation integrated wall adopting the integrated wall construction device comprises the following steps of (S1) cleaning the wall; (S2) positioning the bottom plate; (S3) preparing for gluing on the wall; and (S4) gluing the wall. The installation and constructionprocess aims to solve the problems that when an existing integrated wall body is installed, a gluing area of the integrated wall body cannot be effectively controlled, the difficulty of manual gluingon the wall is large, glue liquid on a gluing roller can drop on an installed integrated wallboard, the decorative surface of the integrated wallboard is influenced and damaged when the surface of the wallboard is cleaned, the gluing amount of the integrated wallboard cannot be effectively controlled, and the degree of attaching compactness of the integrated wallboard is influenced.
本发明涉及一种保温隔热集成墙面安装施工工艺,该保温隔热集成墙面安装施工工艺采用如下集成墙面施工装置,集成墙面施工装置包括底板、滑动杆、滑动座、伸缩板、刷胶机构和导向支架;采用上述集成墙面施工装置对保温隔热集成墙面的安装施工工艺,包括以下步骤:S1、墙面清理;S2、底板定位;S3、墙面刷胶准备;S4、墙面刷胶。本发明可以解决现有针对集成墙体安装时存在的:集成墙体的刷胶区域无法得到有效控制,且人工对墙面进行刷胶操作难度大,刷胶辊上的胶液会滴在已安装好的集成墙板上,造成墙板的表面进行清理时影响集成墙板的装饰面发生损坏;集成墙板的刷胶量无法进行有效控制,影响集成墙板的贴合密实程度等问题。
Installation and construction process of heat preservation and insulation integrated wall
一种保温隔热集成墙面安装施工工艺
WU YANLING (author) / XU FA (author)
2021-01-22
Patent
Electronic Resource
Chinese
Heat preservation and insulation integrated wall surface installation construction equipment
European Patent Office | 2020
|Building heat insulation and heat preservation integrated wall installation structure
European Patent Office | 2024
|European Patent Office | 2021
|Installation method of heat preservation and insulation integrated plate
European Patent Office | 2023
|European Patent Office | 2024
|