A platform for research: civil engineering, architecture and urbanism
Steel structure spliced bridge
The invention relates to the field of road and bridge construction and particularly relates to a steel structure spliced bridge. The bridge comprises bridge boxes and a plurality of bridge columns, wherein the bridge columns are vertically arranged, the bottom ends of the bridge columns are fixedly connected with the ground, the bridge boxes are arranged between the adjacent bridge columns, and mounting assemblies are arranged between the two ends of each bridge box and the two adjacent bridge columns; the bridge column comprises a plurality of unit columns, each unit column is vertically arranged, and an inserting assembly is arranged between every two adjacent unit columns. According to the rigid frame bridge, the multiple unit columns are connected into the bridge column through the inserting assemblies, then the bridge box is moved, the bridge box and the bridge column are connected and fixed through the mounting assemblies, and therefore construction of the rigid frame bridge is completed, and the effect of shortening the construction period of the rigid frame bridge is achieved.
本申请涉及道路桥梁施工的领域,尤其是涉及一种钢结构拼接桥梁,其包括桥箱和桥柱,桥柱竖直设置有若干个,桥柱的底端与地面固定连接,桥箱设置在相邻的桥柱之间,桥箱的两端与两个相邻桥柱之间均设置有安装组件,桥柱包括若干个单元柱,每个单元柱均竖直设置,相邻单元柱之间设置有插接组件。本申请中,首先利用插接组件将若干个单元柱连接为桥柱,然后再移动桥箱,通过安装组件将桥箱与桥柱连接固定,从而完成刚构桥的施工,具有缩短刚构桥的施工周期的效果。
Steel structure spliced bridge
The invention relates to the field of road and bridge construction and particularly relates to a steel structure spliced bridge. The bridge comprises bridge boxes and a plurality of bridge columns, wherein the bridge columns are vertically arranged, the bottom ends of the bridge columns are fixedly connected with the ground, the bridge boxes are arranged between the adjacent bridge columns, and mounting assemblies are arranged between the two ends of each bridge box and the two adjacent bridge columns; the bridge column comprises a plurality of unit columns, each unit column is vertically arranged, and an inserting assembly is arranged between every two adjacent unit columns. According to the rigid frame bridge, the multiple unit columns are connected into the bridge column through the inserting assemblies, then the bridge box is moved, the bridge box and the bridge column are connected and fixed through the mounting assemblies, and therefore construction of the rigid frame bridge is completed, and the effect of shortening the construction period of the rigid frame bridge is achieved.
本申请涉及道路桥梁施工的领域,尤其是涉及一种钢结构拼接桥梁,其包括桥箱和桥柱,桥柱竖直设置有若干个,桥柱的底端与地面固定连接,桥箱设置在相邻的桥柱之间,桥箱的两端与两个相邻桥柱之间均设置有安装组件,桥柱包括若干个单元柱,每个单元柱均竖直设置,相邻单元柱之间设置有插接组件。本申请中,首先利用插接组件将若干个单元柱连接为桥柱,然后再移动桥箱,通过安装组件将桥箱与桥柱连接固定,从而完成刚构桥的施工,具有缩短刚构桥的施工周期的效果。
Steel structure spliced bridge
一种钢结构拼接桥梁
XUE LEI (author) / LIU CHAOSONG (author) / YANG YONGGEN (author) / LI DONGJIE (author)
2021-01-29
Patent
Electronic Resource
Chinese