The invention discloses a frame column independent foundation leakage treatment construction method. The method sequentially comprises the steps of checking a water seepage part, cleaning a base layer, marking the water seepage part, distributing holes for the first time, drilling holes for the first time, cleaning and protecting the holes for the first time, distributing nozzles for the first time, filling rigid materials (filling the rigid materials) for the first time, plugging, distributing the holes for the second time, drilling the holes for the second time, cleaning the holes for the second time, protecting the holes, distributing the nozzles for the second time, filling flexible materials (filling the flexible materials) for the second time, disassembling the nozzles and sealing openings. A slurry is uniformly injected into a stratum, the slurry occupies the position after removing moisture and air among soil particles or in rock fractures in a filling, permeating, compacting and the like manner, and the slurry bonds the originally loose soil particles or fractures into a whole after a certain time of manual control, so that the water tightness and the bearing capacity of the foundation are improved. It is ensured that the periphery of a frame column independent foundation is not impacted by a water pressure, and the effects of filling cracks between concretes and reinforcing are achieved while seepage and leakage are avoided.
本发明公开了框架柱独立基础渗漏治理施工方法,工艺流程依次为:核对渗水部位→基层清理→渗水部位标记→第一次布孔→第一次钻孔→第一次清孔、护孔→第一次布嘴→第一次灌刚性材料(刚性材料灌注)→封堵→第二次布孔→第二次钻孔→第二次清孔、护孔→第二次布嘴→第二次灌柔性材料(柔性材料灌注)→拆嘴→封口环节;把浆液均匀地注入地层中,浆液以充实、渗透和挤密等方式,赶走土颗粒间或岩石裂隙中的水分和空气后,占据其位置,经过人工控制一定的时间后,浆液将原来松散的土粒或裂隙胶结成一个整体,达到提高地基的不透水性和承载力,确保框架柱独立基础周边不受水压的冲击,在达到不渗不漏的同时,还起到填充混凝土之间裂缝和加固作用。
The invention discloses a frame column independent foundation leakage treatment construction method. The method sequentially comprises the steps of checking a water seepage part, cleaning a base layer, marking the water seepage part, distributing holes for the first time, drilling holes for the first time, cleaning and protecting the holes for the first time, distributing nozzles for the first time, filling rigid materials (filling the rigid materials) for the first time, plugging, distributing the holes for the second time, drilling the holes for the second time, cleaning the holes for the second time, protecting the holes, distributing the nozzles for the second time, filling flexible materials (filling the flexible materials) for the second time, disassembling the nozzles and sealing openings. A slurry is uniformly injected into a stratum, the slurry occupies the position after removing moisture and air among soil particles or in rock fractures in a filling, permeating, compacting and the like manner, and the slurry bonds the originally loose soil particles or fractures into a whole after a certain time of manual control, so that the water tightness and the bearing capacity of the foundation are improved. It is ensured that the periphery of a frame column independent foundation is not impacted by a water pressure, and the effects of filling cracks between concretes and reinforcing are achieved while seepage and leakage are avoided.
本发明公开了框架柱独立基础渗漏治理施工方法,工艺流程依次为:核对渗水部位→基层清理→渗水部位标记→第一次布孔→第一次钻孔→第一次清孔、护孔→第一次布嘴→第一次灌刚性材料(刚性材料灌注)→封堵→第二次布孔→第二次钻孔→第二次清孔、护孔→第二次布嘴→第二次灌柔性材料(柔性材料灌注)→拆嘴→封口环节;把浆液均匀地注入地层中,浆液以充实、渗透和挤密等方式,赶走土颗粒间或岩石裂隙中的水分和空气后,占据其位置,经过人工控制一定的时间后,浆液将原来松散的土粒或裂隙胶结成一个整体,达到提高地基的不透水性和承载力,确保框架柱独立基础周边不受水压的冲击,在达到不渗不漏的同时,还起到填充混凝土之间裂缝和加固作用。
Frame column independent foundation leakage treatment construction method
框架柱独立基础渗漏治理施工方法
2021-01-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
ARRANGEMENT ADJUSTMENT FRAME AND INDEPENDENT FOUNDATION CONSTRUCTION METHOD
European Patent Office | 2017
|Independent foundation column formwork reinforcing device and construction method
European Patent Office | 2024
|Construction method for changing double-column independent foundation into strip-shaped foundation
European Patent Office | 2024
|Reverse construction method for pile foundation of inner frame column bearing platform
European Patent Office | 2023
|Light structure under-column assembly type independent foundation and construction method thereof
European Patent Office | 2021
|