A platform for research: civil engineering, architecture and urbanism
Steel strand bundle integral perforated channel construction frame for tower
The invention relates to the technical field of towers, and discloses a steel strand bundle integral perforation channel construction frame for a tower. The frame comprises a construction frame body and a concrete tower barrel, concave steel plates are symmetrically and fixedly connected to the lower end of the construction frame body, supporting blocks are symmetrically and fixedly connected to the upper end of the concrete tower barrel, and the steel plates clamp the supporting blocks. The steel plate is matched with the supporting block and connected with the supporting block through a reinforcing mechanism. The reinforcing mechanism comprises a supporting hole, a spring, two reinforcing blocks and two reinforcing holes, the supporting hole is formed in the supporting block, the springis arranged in the center of the supporting hole, the axis of the supporting hole and the axis of the spring are overlapped, the two reinforcing blocks are symmetrically and fixedly connected to the two ends of the spring, and the cross sections of the reinforcing blocks are right trapezoids. According to the steel strand bundle integral perforated channel construction frame for the tower, the problems that the lower end of an existing construction frame body is only simply connected with the top surface of a concrete tower drum through a steel plate, the two sets of connection modes are simple, and connection is not firm enough can be solved.
本发明涉及塔架技术领域,且公开了一种塔架用钢绞线束整体穿孔道施工架,包括施工架体和混凝土塔筒,施工架体的下端对称固定连接有凹型的钢板,混凝土塔筒的上端对称固定连接有支撑块,钢板夹持支撑块设置,且钢板和支撑块相匹配,钢板与支撑块通过加固机构相连接;加固机构包括支撑孔、弹簧、两个加固块和两个加固孔,支撑孔开设在支撑块上,弹簧设置在支撑孔的中心处,且支撑孔和弹簧的轴线相重叠,两块加固块对称固定连接在弹簧的两端,加固块的横剖面为直角梯形。该塔架用钢绞线束整体穿孔道施工架,能够解决目前施工架体的下端只是简单的通过钢板与混凝土塔筒的顶面相连接,两组连接方式简单,连接不够牢固的问题。
Steel strand bundle integral perforated channel construction frame for tower
The invention relates to the technical field of towers, and discloses a steel strand bundle integral perforation channel construction frame for a tower. The frame comprises a construction frame body and a concrete tower barrel, concave steel plates are symmetrically and fixedly connected to the lower end of the construction frame body, supporting blocks are symmetrically and fixedly connected to the upper end of the concrete tower barrel, and the steel plates clamp the supporting blocks. The steel plate is matched with the supporting block and connected with the supporting block through a reinforcing mechanism. The reinforcing mechanism comprises a supporting hole, a spring, two reinforcing blocks and two reinforcing holes, the supporting hole is formed in the supporting block, the springis arranged in the center of the supporting hole, the axis of the supporting hole and the axis of the spring are overlapped, the two reinforcing blocks are symmetrically and fixedly connected to the two ends of the spring, and the cross sections of the reinforcing blocks are right trapezoids. According to the steel strand bundle integral perforated channel construction frame for the tower, the problems that the lower end of an existing construction frame body is only simply connected with the top surface of a concrete tower drum through a steel plate, the two sets of connection modes are simple, and connection is not firm enough can be solved.
本发明涉及塔架技术领域,且公开了一种塔架用钢绞线束整体穿孔道施工架,包括施工架体和混凝土塔筒,施工架体的下端对称固定连接有凹型的钢板,混凝土塔筒的上端对称固定连接有支撑块,钢板夹持支撑块设置,且钢板和支撑块相匹配,钢板与支撑块通过加固机构相连接;加固机构包括支撑孔、弹簧、两个加固块和两个加固孔,支撑孔开设在支撑块上,弹簧设置在支撑孔的中心处,且支撑孔和弹簧的轴线相重叠,两块加固块对称固定连接在弹簧的两端,加固块的横剖面为直角梯形。该塔架用钢绞线束整体穿孔道施工架,能够解决目前施工架体的下端只是简单的通过钢板与混凝土塔筒的顶面相连接,两组连接方式简单,连接不够牢固的问题。
Steel strand bundle integral perforated channel construction frame for tower
一种塔架用钢绞线束整体穿孔道施工架
ZHANG ZHAOJIAN (author) / XU DEGUI (author)
2021-01-29
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|