A platform for research: civil engineering, architecture and urbanism
Building foundation isolation hydraulic control deviation rectifying method
The invention relates to a foundation isolation hydraulic control deviation rectifying method, and belongs to the field of building deviation rectifying engineering. According to the method, a certainamount of isolation seal bags (2) are arranged in a soil body adjacent to an inclined building, the volume of the isolation seal bags (2) is increased or decreased so that the soil body on two sidesof the isolation sealed bags (2) generate relative displacement, and therefore, jacking deviation rectification or forced landing deviation rectification of the inclined building is realized. According to the building deviation rectifying method, the construction process is safe and controllable, the deviation rectifying speed is high, the control precision is high, the construction cost is low, and a safe, reliable, feasible and cost-saving new way is provided for building deviation rectifying, especially deviation rectifying of a deeply-buried pile foundation building.
本发明涉及建筑物纠偏工程领域中的一种基础隔离液压控制纠偏方法,该方法通过在邻近倾斜建筑物的土体中设置一定量的隔离密封袋(2),利用隔离密封袋(2)体积增加或减少,使得隔离密封袋(2)两侧土体产生相对位移,以实现倾斜建筑物的顶升纠偏或迫降纠偏,本发明的建筑物纠偏方法,施工过程安全可控,纠偏速度快,控制精度高,施工造价低,为建筑纠偏,特别是深埋桩基础建筑物纠偏提供了一个安全可靠、切实可行、造价节省的新途径。
Building foundation isolation hydraulic control deviation rectifying method
The invention relates to a foundation isolation hydraulic control deviation rectifying method, and belongs to the field of building deviation rectifying engineering. According to the method, a certainamount of isolation seal bags (2) are arranged in a soil body adjacent to an inclined building, the volume of the isolation seal bags (2) is increased or decreased so that the soil body on two sidesof the isolation sealed bags (2) generate relative displacement, and therefore, jacking deviation rectification or forced landing deviation rectification of the inclined building is realized. According to the building deviation rectifying method, the construction process is safe and controllable, the deviation rectifying speed is high, the control precision is high, the construction cost is low, and a safe, reliable, feasible and cost-saving new way is provided for building deviation rectifying, especially deviation rectifying of a deeply-buried pile foundation building.
本发明涉及建筑物纠偏工程领域中的一种基础隔离液压控制纠偏方法,该方法通过在邻近倾斜建筑物的土体中设置一定量的隔离密封袋(2),利用隔离密封袋(2)体积增加或减少,使得隔离密封袋(2)两侧土体产生相对位移,以实现倾斜建筑物的顶升纠偏或迫降纠偏,本发明的建筑物纠偏方法,施工过程安全可控,纠偏速度快,控制精度高,施工造价低,为建筑纠偏,特别是深埋桩基础建筑物纠偏提供了一个安全可靠、切实可行、造价节省的新途径。
Building foundation isolation hydraulic control deviation rectifying method
一种建筑物基础隔离液压控制纠偏方法
ZHANG JIHONG (author)
2021-02-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Deviation rectifying method for soil foundation building
European Patent Office | 2023
|Building deviation rectifying structure and deviation rectifying method
European Patent Office | 2021
|European Patent Office | 2023
|Deviation rectifying and reinforcing structure for shallow foundation building
European Patent Office | 2024
|