A platform for research: civil engineering, architecture and urbanism
Assembly type waterside gallery road and construction method thereof
The invention discloses an assembly type waterside gallery road. The assembly type waterside gallery road comprises prefabricated square pile assemblies, prefabricated cross beam assemblies, prefabricated panel assemblies, an upper pavement and handrails, standard prefabricated square piles are driven into specified elevations and positions, the standard prefabricated cross beams are horizontallyarranged on pile heads in a sleeving mode, erected on pile foundation brackets and provided with pile caps, then standard prefabricated panels are placed on assembled square pile cross beam structures, and finally the upper pavement, the handrails and the like are installed to form the gallery road. The assembly type waterside gallery road is reliable in structure and good in ecological landscape.Components can be dismantled in order according to requirements, waste concrete is not left in the soil body, and the influence on ecology is reduced. Factory standard prefabrication is adopted, thecost is low, the universality is good, the site cast-in-place concrete construction step is completely avoided, the site construction period is shortened, the construction quality is good, and the environmental influence is small.
一种装配式亲水栈道,该装配式亲水栈道包括预制方桩组件、预制横梁组件、预制面板组件、上部铺装和栏杆。所述标准预制方桩打入指定的标高和位置,标准预制横梁水平套在桩头上,架在桩基牛腿上,安装桩帽,再将标准预制面板搁置已组装完成的方桩横梁结构上,最后安装上部铺装和栏杆等组成栈道。本发明的装配式亲水栈道结构可靠,生态景观性好。构件可根据需求有序拆除,不在土体内遗留废弃混凝土,减小对于生态的影响。采用工厂标准预制,成本较低、通用性好,完全回避了现场现浇混凝土施工步骤,缩短了现场施工周期,施工质量好,环境影响较小。
Assembly type waterside gallery road and construction method thereof
The invention discloses an assembly type waterside gallery road. The assembly type waterside gallery road comprises prefabricated square pile assemblies, prefabricated cross beam assemblies, prefabricated panel assemblies, an upper pavement and handrails, standard prefabricated square piles are driven into specified elevations and positions, the standard prefabricated cross beams are horizontallyarranged on pile heads in a sleeving mode, erected on pile foundation brackets and provided with pile caps, then standard prefabricated panels are placed on assembled square pile cross beam structures, and finally the upper pavement, the handrails and the like are installed to form the gallery road. The assembly type waterside gallery road is reliable in structure and good in ecological landscape.Components can be dismantled in order according to requirements, waste concrete is not left in the soil body, and the influence on ecology is reduced. Factory standard prefabrication is adopted, thecost is low, the universality is good, the site cast-in-place concrete construction step is completely avoided, the site construction period is shortened, the construction quality is good, and the environmental influence is small.
一种装配式亲水栈道,该装配式亲水栈道包括预制方桩组件、预制横梁组件、预制面板组件、上部铺装和栏杆。所述标准预制方桩打入指定的标高和位置,标准预制横梁水平套在桩头上,架在桩基牛腿上,安装桩帽,再将标准预制面板搁置已组装完成的方桩横梁结构上,最后安装上部铺装和栏杆等组成栈道。本发明的装配式亲水栈道结构可靠,生态景观性好。构件可根据需求有序拆除,不在土体内遗留废弃混凝土,减小对于生态的影响。采用工厂标准预制,成本较低、通用性好,完全回避了现场现浇混凝土施工步骤,缩短了现场施工周期,施工质量好,环境影响较小。
Assembly type waterside gallery road and construction method thereof
一种装配式亲水栈道及施工方法
MA RUBIN (author) / DONG XUEGANG (author) / ZOU HENG (author) / WANG HONGYUAN (author) / WANG LULU (author) / GU WEI (author) / CAO KUN (author)
2021-02-19
Patent
Electronic Resource
Chinese
Waterside mud flat road structure and construction method thereof
European Patent Office | 2023
|Fabricated waterside footpath and construction method thereof
European Patent Office | 2021
|Turnover climbing type waterside system and construction method
European Patent Office | 2024
|