A platform for research: civil engineering, architecture and urbanism
The invention belongs to the field of bridge construction, particularly relates to a bridge supporting and adjusting device for bridge construction, and provides the following scheme for solving the problems that an existing supporting device is small in supporting area, poor in supporting stability and inconvenient to move: the bridge supporting and adjusting device comprises a first bottom plate, and a second bottom plate is mounted on the left side of the first bottom plate; fixed columns are fixedly mounted at the tops of the first bottom plate and the second bottom plate, supporting pipesare slidably mounted on the outer sides of the two fixed columns, a first supporting plate and a second supporting plate are fixedly mounted at the tops of the two supporting pipes respectively, a first connecting groove is formed in the right side of the first supporting plate, and a first connecting plate is slidably mounted in the first connecting groove; and the right side of the first connecting plate is fixedly connected with the left side of the second supporting plate. The supporting area can be increased, use is more stable, the two supporting pipes can be fixed at the same time, idler wheels can be folded, the placement stability is improved, the structure is simple, and use is convenient.
本发明属于桥梁施工领域,尤其是一种桥梁施工用桥梁支撑调节装置,针对现有的支撑装置的支撑面积较小,支撑的稳定性较差,且不方便进行移动问题,现提出如下方案,其包括第一底板,所述第一底板的左侧安装有第二底板,第一底板和第二底板的顶部均固定安装有固定柱,两个固定柱的外侧均滑动安装有支撑管,两个支撑管的顶部分别固定安装有第一支撑板和第二支撑板,所述第一支撑板的右侧开设有第一连接槽,第一连接槽内滑动安装有第一连接板,第一连接板的右侧与第二支撑板的左侧固定连接,本发明可以增加支撑面积,使用更加稳定,同时可以对两个支撑管进行固定,且可以将滚轮收起,增加放置的稳定性,结构简单,使用方便。
The invention belongs to the field of bridge construction, particularly relates to a bridge supporting and adjusting device for bridge construction, and provides the following scheme for solving the problems that an existing supporting device is small in supporting area, poor in supporting stability and inconvenient to move: the bridge supporting and adjusting device comprises a first bottom plate, and a second bottom plate is mounted on the left side of the first bottom plate; fixed columns are fixedly mounted at the tops of the first bottom plate and the second bottom plate, supporting pipesare slidably mounted on the outer sides of the two fixed columns, a first supporting plate and a second supporting plate are fixedly mounted at the tops of the two supporting pipes respectively, a first connecting groove is formed in the right side of the first supporting plate, and a first connecting plate is slidably mounted in the first connecting groove; and the right side of the first connecting plate is fixedly connected with the left side of the second supporting plate. The supporting area can be increased, use is more stable, the two supporting pipes can be fixed at the same time, idler wheels can be folded, the placement stability is improved, the structure is simple, and use is convenient.
本发明属于桥梁施工领域,尤其是一种桥梁施工用桥梁支撑调节装置,针对现有的支撑装置的支撑面积较小,支撑的稳定性较差,且不方便进行移动问题,现提出如下方案,其包括第一底板,所述第一底板的左侧安装有第二底板,第一底板和第二底板的顶部均固定安装有固定柱,两个固定柱的外侧均滑动安装有支撑管,两个支撑管的顶部分别固定安装有第一支撑板和第二支撑板,所述第一支撑板的右侧开设有第一连接槽,第一连接槽内滑动安装有第一连接板,第一连接板的右侧与第二支撑板的左侧固定连接,本发明可以增加支撑面积,使用更加稳定,同时可以对两个支撑管进行固定,且可以将滚轮收起,增加放置的稳定性,结构简单,使用方便。
Bridge supporting and adjusting device for bridge construction
European Patent Office | 2022
|Bridge supporting and adjusting device for bridge construction
European Patent Office | 2022
|Bridge supporting device with adjusting structure for bridge construction
European Patent Office | 2024
|Bridge bent cap formwork supporting and adjusting device and bridge bent cap construction method
European Patent Office | 2021
|