Connection corridor construction method
The invention discloses a connection corridor construction method. The connection corridor construction method comprises the following steps that a truss is assembled on a jig frame and leveled; the truss is suspended after being hoisted to a certain height through a hoisting device, and then a lower hanging layer is installed on the lower portion of the truss; and continuous hoisting is conducted, the truss and the lower hanging layer are hoisted to a specified floor together, the truss and the lower hanging layer are connected with a butt joint opening of the specified floor, and then a truss upper structure is mounted on the upper portion of the truss. The truss is hoisted to a certain height through the hoisting device and then suspended, and then the lower hanging layer is mounted onthe lower portion of the truss; the truss is hoisted to the designated floor through the hoisting device, and the truss and the lower hanging layer are connected with the butt joint opening extendingout of the floor, thus in the connection corridor mounting process, through the mode that the truss is hoisted firstly, then the lower hanging layer is mounted, and the truss upper structure is additionally mounted after the truss is in place, potential safety hazards caused by insufficient bearing capacity of a floor layer can be effectively prevented, and the connection corridor construction method is suitable for the field of building construction.
本发明公开了一种连廊施工方法,包括以下步骤:在胎架上拼装桁架并对桁架进行调平;通过起吊装置将桁架吊至一定高度后悬停,然后在桁架下方安装下挂吊层;继续起吊,将桁架以及下挂吊层一起吊至指定楼层,将桁架以及下挂吊层与指定楼层的对接口连接,然后在桁架上方安装桁架上部结构,通过起吊装置将桁架起吊至一定高度然后悬停,然后在桁架下方安装下挂吊层,通过起吊装置将桁架吊到指定楼层,将桁架以及下挂吊层与伸出楼层的对接口连接,这样在连廊安装过程中,首先将桁架吊起,然后安装下挂吊层,桁架到位后加装桁架上部结构的方式能够有效防止楼面层出现承载力不足引发安全隐患,本发明适用于建筑施工领域。
Connection corridor construction method
The invention discloses a connection corridor construction method. The connection corridor construction method comprises the following steps that a truss is assembled on a jig frame and leveled; the truss is suspended after being hoisted to a certain height through a hoisting device, and then a lower hanging layer is installed on the lower portion of the truss; and continuous hoisting is conducted, the truss and the lower hanging layer are hoisted to a specified floor together, the truss and the lower hanging layer are connected with a butt joint opening of the specified floor, and then a truss upper structure is mounted on the upper portion of the truss. The truss is hoisted to a certain height through the hoisting device and then suspended, and then the lower hanging layer is mounted onthe lower portion of the truss; the truss is hoisted to the designated floor through the hoisting device, and the truss and the lower hanging layer are connected with the butt joint opening extendingout of the floor, thus in the connection corridor mounting process, through the mode that the truss is hoisted firstly, then the lower hanging layer is mounted, and the truss upper structure is additionally mounted after the truss is in place, potential safety hazards caused by insufficient bearing capacity of a floor layer can be effectively prevented, and the connection corridor construction method is suitable for the field of building construction.
本发明公开了一种连廊施工方法,包括以下步骤:在胎架上拼装桁架并对桁架进行调平;通过起吊装置将桁架吊至一定高度后悬停,然后在桁架下方安装下挂吊层;继续起吊,将桁架以及下挂吊层一起吊至指定楼层,将桁架以及下挂吊层与指定楼层的对接口连接,然后在桁架上方安装桁架上部结构,通过起吊装置将桁架起吊至一定高度然后悬停,然后在桁架下方安装下挂吊层,通过起吊装置将桁架吊到指定楼层,将桁架以及下挂吊层与伸出楼层的对接口连接,这样在连廊安装过程中,首先将桁架吊起,然后安装下挂吊层,桁架到位后加装桁架上部结构的方式能够有效防止楼面层出现承载力不足引发安全隐患,本发明适用于建筑施工领域。
Connection corridor construction method
一种连廊施工方法
LI WENBO (author) / BIAO PENG (author) / SHEN YINPING (author) / ZHOU QIANG (author) / ZHI YAJUN (author) / FU PENGLI (author) / ZHANG YU (author)
2021-02-19
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Fabricated corridor, corridor end connecting structure and construction method
European Patent Office | 2023
|European Patent Office | 2017
|Construction method of overhead corridor and overhead corridor structure
European Patent Office | 2021
|