A platform for research: civil engineering, architecture and urbanism
Light heat-insulation energy-saving building board and preparation method thereof
The invention discloses a light heat-insulation energy-saving building board and a preparation method thereof. The light heat-insulation energy-saving building board comprises a board body, reinforcing ribs, third grooves and bolt holes, wherein a reinforcing layer is arranged in the board body, and a first groove and a second groove are formed in the top end of the reinforcing layer; the reinforcing ribs are mounted below the first groove, and a fixing frame is arranged below the reinforcing ribs; a supporting piece is arranged in the fixing frame; a first limiting piece is arranged on the left side of the board body; the third grooves are formed in the right side of the interior of the board body; and a mounting piece is arranged in the middle of the supporting piece. According to the light heat-insulation energy-saving building board and the preparation method thereof, the first groove and the second groove are formed in the top of the reinforcing layer, and the third grooves are formed in the side face of the reinforcing layer, so that splicing operation in the horizontal direction and the vertical direction is conducted on the board body conveniently, convenience is brought toworkers, the mounting progress is accelerated, and accordingly the whole working efficiency is improved.
本发明公开了一种轻质隔热节能建筑板材及其制备方法,包括板材本体、加强筋、第三凹槽和螺栓孔,所述板材本体的内部设置有加固层,且加固层的顶端开设有第一凹槽和第二凹槽,所述第一凹槽的下方安装有加强筋,且加强筋的下方设置有固定架,所述固定架的内部设置有支撑件,所述板材本体的左侧设置有第一限位件,所述第三凹槽开设于板材本体的内部右侧,所述支撑件的正中间设置有安装件。该轻质隔热节能建筑板材及其制备方法,加固层的顶部开设有第一凹槽和第二凹槽,且加固层的侧面开设有第三凹槽,这样便于对板材本体之间进行水平方向和竖直方向的拼接操作,为工作人员带来便捷,加快安装进度,进而提高了整个工作效率。
Light heat-insulation energy-saving building board and preparation method thereof
The invention discloses a light heat-insulation energy-saving building board and a preparation method thereof. The light heat-insulation energy-saving building board comprises a board body, reinforcing ribs, third grooves and bolt holes, wherein a reinforcing layer is arranged in the board body, and a first groove and a second groove are formed in the top end of the reinforcing layer; the reinforcing ribs are mounted below the first groove, and a fixing frame is arranged below the reinforcing ribs; a supporting piece is arranged in the fixing frame; a first limiting piece is arranged on the left side of the board body; the third grooves are formed in the right side of the interior of the board body; and a mounting piece is arranged in the middle of the supporting piece. According to the light heat-insulation energy-saving building board and the preparation method thereof, the first groove and the second groove are formed in the top of the reinforcing layer, and the third grooves are formed in the side face of the reinforcing layer, so that splicing operation in the horizontal direction and the vertical direction is conducted on the board body conveniently, convenience is brought toworkers, the mounting progress is accelerated, and accordingly the whole working efficiency is improved.
本发明公开了一种轻质隔热节能建筑板材及其制备方法,包括板材本体、加强筋、第三凹槽和螺栓孔,所述板材本体的内部设置有加固层,且加固层的顶端开设有第一凹槽和第二凹槽,所述第一凹槽的下方安装有加强筋,且加强筋的下方设置有固定架,所述固定架的内部设置有支撑件,所述板材本体的左侧设置有第一限位件,所述第三凹槽开设于板材本体的内部右侧,所述支撑件的正中间设置有安装件。该轻质隔热节能建筑板材及其制备方法,加固层的顶部开设有第一凹槽和第二凹槽,且加固层的侧面开设有第三凹槽,这样便于对板材本体之间进行水平方向和竖直方向的拼接操作,为工作人员带来便捷,加快安装进度,进而提高了整个工作效率。
Light heat-insulation energy-saving building board and preparation method thereof
一种轻质隔热节能建筑板材及其制备方法
ZHAI HUIYING (author)
2021-02-19
Patent
Electronic Resource
Chinese
Composite building energy-saving thermal insulation board and preparation method thereof
European Patent Office | 2024
|European Patent Office | 2022
|Building energy-saving thermal insulation material and thermal insulation board thereof
European Patent Office | 2021
|Lightweight building energy-saving insulation board and production method thereof
European Patent Office | 2022
|