A platform for research: civil engineering, architecture and urbanism
Construction device and method for treating bumping at bridgehead
The invention discloses a construction device and method for treating bumping at a bridgehead. When a grouting pump pumps grout in a grout storage tank, a stirring assembly is used for continuously stirring the grout, it can be guaranteed that the grout is uniform, and thus the quality of the grout injected into a drilled hole is guaranteed, and it is guaranteed that after a roadbed is grouted, the roadbed is bonded into a whole with high strength, low compression, high impermeability and good stability, and thus settlement is effectively reduced, and bumping at the bridgehead is treated.
本发明公开了一种治理桥头跳车的施工装置及方法,通过在所述注浆泵抽取所述储浆罐内的浆液时,利用所述搅拌组件对浆液进行不断搅拌,能够确保浆液均匀,以此保证注入所述钻孔内的浆液质量,保证该路基在注浆后,路基胶结成一个强度高、压缩低、抗渗性高以及稳定性好的整体,以此有效减少沉降,从而治理桥头跳车。
Construction device and method for treating bumping at bridgehead
The invention discloses a construction device and method for treating bumping at a bridgehead. When a grouting pump pumps grout in a grout storage tank, a stirring assembly is used for continuously stirring the grout, it can be guaranteed that the grout is uniform, and thus the quality of the grout injected into a drilled hole is guaranteed, and it is guaranteed that after a roadbed is grouted, the roadbed is bonded into a whole with high strength, low compression, high impermeability and good stability, and thus settlement is effectively reduced, and bumping at the bridgehead is treated.
本发明公开了一种治理桥头跳车的施工装置及方法,通过在所述注浆泵抽取所述储浆罐内的浆液时,利用所述搅拌组件对浆液进行不断搅拌,能够确保浆液均匀,以此保证注入所述钻孔内的浆液质量,保证该路基在注浆后,路基胶结成一个强度高、压缩低、抗渗性高以及稳定性好的整体,以此有效减少沉降,从而治理桥头跳车。
Construction device and method for treating bumping at bridgehead
一种治理桥头跳车的施工装置及方法
LEI YUN (author) / LIU CHONG (author) / XIAO GUIYUAN (author) / YANG YANJUN (author) / LIU XUECAI (author)
2021-02-23
Patent
Electronic Resource
Chinese
Bridgehead roadbed composite structure for preventing bumping at bridgehead and construction method
European Patent Office | 2022
|European Patent Office | 2024
|Construction device and method for solving bumping at bridgehead
European Patent Office | 2021
|Butt strap structure construction method for bridgehead bumping
European Patent Office | 2020
|