A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of curtain wall structures, and provides a curtain wall structure formed by dry hanging of perforated bricks and ceramic gaskets. The curtain wall structure comprises a wall body and a plurality of rear embedded plates connected to the wall body in a matrix manner. Each rear embedded plate is connected with a pair of corner braces, and the rear embeddedplates are located between the multiple pairs of corner braces which are vertically distributed. The rear embedded plates are connected to the same square tube through second bolts. The lower ends ofthe sides, away from the wall, of the multiple square pipes are connected with the same first angle steel, and multiple sets of screws are fixedly connected to the first angle steel. According to thecurtain wall structure formed by dry hanging of the perforated bricks and the ceramic gaskets, the defects in the prior art are overcome, the design is reasonable, the structure is compact, the problems that a traditional curtain wall is poor in structural stability, multiple in structure and low in construction efficiency are solved, the stability and the anti-aging effect of the curtain wall are improved through simple structural combination and combination of the perforated bricks, the ceramic gaskets and the screw rods, and the service life of the curtain wall is prolonged. Meanwhile, thecurtain wall is few in structure, convenient to install, easy to disassemble and high in practicability.
本发明涉及幕墙结构技术领域,提供了一种采用开孔砖和陶瓷垫片干挂而成的幕墙结构,包括墙体和矩阵连接有在墙体上的多个后置埋板,多个后置埋板上均连接有一对角码,处于垂直分布的多对角码之间,均通过第二螺栓连接有同一个方管;多个方管远离墙体的一侧下端连接有同一个第一角钢,第一角钢上固定连接有多组螺杆。本发明克服了现有技术的不足,设计合理,结构紧凑,解决了传统的幕墙结构稳固性差、结构多、施工效率低的问题,本发明通过简单的结构组合,采用开孔砖和陶瓷垫片以及螺杆的组合,提高了幕墙的稳固性和抗老化效果,能够提高幕墙的使用寿命,同时结构少,安装方便,同时易于拆卸,具有很强的实用性。
The invention relates to the technical field of curtain wall structures, and provides a curtain wall structure formed by dry hanging of perforated bricks and ceramic gaskets. The curtain wall structure comprises a wall body and a plurality of rear embedded plates connected to the wall body in a matrix manner. Each rear embedded plate is connected with a pair of corner braces, and the rear embeddedplates are located between the multiple pairs of corner braces which are vertically distributed. The rear embedded plates are connected to the same square tube through second bolts. The lower ends ofthe sides, away from the wall, of the multiple square pipes are connected with the same first angle steel, and multiple sets of screws are fixedly connected to the first angle steel. According to thecurtain wall structure formed by dry hanging of the perforated bricks and the ceramic gaskets, the defects in the prior art are overcome, the design is reasonable, the structure is compact, the problems that a traditional curtain wall is poor in structural stability, multiple in structure and low in construction efficiency are solved, the stability and the anti-aging effect of the curtain wall are improved through simple structural combination and combination of the perforated bricks, the ceramic gaskets and the screw rods, and the service life of the curtain wall is prolonged. Meanwhile, thecurtain wall is few in structure, convenient to install, easy to disassemble and high in practicability.
本发明涉及幕墙结构技术领域,提供了一种采用开孔砖和陶瓷垫片干挂而成的幕墙结构,包括墙体和矩阵连接有在墙体上的多个后置埋板,多个后置埋板上均连接有一对角码,处于垂直分布的多对角码之间,均通过第二螺栓连接有同一个方管;多个方管远离墙体的一侧下端连接有同一个第一角钢,第一角钢上固定连接有多组螺杆。本发明克服了现有技术的不足,设计合理,结构紧凑,解决了传统的幕墙结构稳固性差、结构多、施工效率低的问题,本发明通过简单的结构组合,采用开孔砖和陶瓷垫片以及螺杆的组合,提高了幕墙的稳固性和抗老化效果,能够提高幕墙的使用寿命,同时结构少,安装方便,同时易于拆卸,具有很强的实用性。
Curtain wall structure formed by dry hanging of perforated bricks and ceramic gaskets
一种采用开孔砖和陶瓷垫片干挂而成的幕墙结构
YANG KANG (author)
2021-03-02
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Dry hanging type bricklaying method adopting ceramic gaskets and perforated bricks as materials
European Patent Office | 2021
|