A platform for research: civil engineering, architecture and urbanism
Laying equipment and construction method for roof waterproof coiled materials
The invention relates to laying equipment and a construction method for roof waterproof coiled materials. The equipment comprises a laying equipment body of the roof waterproof coiled materials; the laying equipment body comprises a supporting beam; a pulley is arranged on the supporting beam; walking frames are arranged at the two sides of the supporting beam; reels are rotatably connected in thewalking frames; inhaul cables with one ends fixed to the pulley are wound on the reels; a winding mechanism is arranged at one side of the reels; a plurality of flame guns are arranged at the lower sides of the walking frames; storage bins are fixedly connected with one sides of the walking frames; conveying belts are horizontally arranged on the bottom faces of the storage bins; belt driving mechanisms are arranged on the walking frames; and discharging ports are formed in the sides, close to the flame guns, of the storage bins. The laying equipment and the construction method for the roof waterproof coiled materials have the effects that the burden of workers is reduced, and the laying quality is improved.
本申请涉及屋面防水卷材的铺设设备及施工方法,其包括一种屋面防水卷材的铺设设备,包括支撑梁,支撑梁上设置有滑轮,支撑梁的两侧均设置有行走架,行走架内转动连接有卷盘,卷盘上缠绕有一端固定于滑轮的拉索,卷盘一侧设置有收卷机构,行走架的下侧设置有多个喷火枪,行走架的一侧固接有储料仓,储料仓的底面水平设置有传送带,行走架设置有带驱动机构,储料仓靠近喷火枪的一侧开设有出料口。本申请具有减少工作人员负担,提高铺设质量的效果。
Laying equipment and construction method for roof waterproof coiled materials
The invention relates to laying equipment and a construction method for roof waterproof coiled materials. The equipment comprises a laying equipment body of the roof waterproof coiled materials; the laying equipment body comprises a supporting beam; a pulley is arranged on the supporting beam; walking frames are arranged at the two sides of the supporting beam; reels are rotatably connected in thewalking frames; inhaul cables with one ends fixed to the pulley are wound on the reels; a winding mechanism is arranged at one side of the reels; a plurality of flame guns are arranged at the lower sides of the walking frames; storage bins are fixedly connected with one sides of the walking frames; conveying belts are horizontally arranged on the bottom faces of the storage bins; belt driving mechanisms are arranged on the walking frames; and discharging ports are formed in the sides, close to the flame guns, of the storage bins. The laying equipment and the construction method for the roof waterproof coiled materials have the effects that the burden of workers is reduced, and the laying quality is improved.
本申请涉及屋面防水卷材的铺设设备及施工方法,其包括一种屋面防水卷材的铺设设备,包括支撑梁,支撑梁上设置有滑轮,支撑梁的两侧均设置有行走架,行走架内转动连接有卷盘,卷盘上缠绕有一端固定于滑轮的拉索,卷盘一侧设置有收卷机构,行走架的下侧设置有多个喷火枪,行走架的一侧固接有储料仓,储料仓的底面水平设置有传送带,行走架设置有带驱动机构,储料仓靠近喷火枪的一侧开设有出料口。本申请具有减少工作人员负担,提高铺设质量的效果。
Laying equipment and construction method for roof waterproof coiled materials
屋面防水卷材的铺设设备及施工方法
TIAN YAWEI (author) / TIAN YAKUN (author) / TIAN XIANZHONG (author) / CHEN XIAOGAO (author) / KONG WEIGUANG (author)
2021-03-02
Patent
Electronic Resource
Chinese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Coiled material waterproof laying equipment and coiled material waterproof laying method
European Patent Office | 2021
|Waterproof coiled material laying method for inclined roof
European Patent Office | 2024
|