Frame structure beam-column joint core area construction method
The invention relates to the technical field of beam-column construction, in particular to a frame structure beam-column joint core area construction method. The frame structure beam-column joint corearea construction method comprises the following steps that S1, frame beam-column joint steel bars are installed; S11, bottom plate frame beam-column joint steel bars are installed; s12, middle-layerplate and top plate frame beam-column joint steel bars are installed; S2, core column additional steel bars 1 are installed and fixed; S3, construction joints are divided; S4, core area concrete construction; and S5, construction joints are treated. A frame structure beam-column joint core area and structural slabs are synchronously constructed, the construction method is advanced, the construction speed is high, the construction quality is greatly improved, and the construction cost is saved. The frame structure beam-column joint core area construction method is mainly applied to frame structure beam-column joint core area construction.
本发明涉及梁柱施工技术领域,更具体而言,涉及框架结构梁柱节点核心区施工工法。包括以下步骤:S1、框架梁柱节点钢筋安装:S11、底板框架梁柱节点钢筋安装;S12、中层板及顶板框架梁柱节点钢筋安装;S2、芯柱附加钢筋1安装及固定;S3、施工缝划分;S4、核心区混凝土施工;S5、施工缝处理。框架梁柱节点核心区与结构板同步施工工法技术先进,施工速度快,大大提高了施工质量且节约了施工成本。本发明主要应用于框架结构梁柱节点核心区施工。
Frame structure beam-column joint core area construction method
The invention relates to the technical field of beam-column construction, in particular to a frame structure beam-column joint core area construction method. The frame structure beam-column joint corearea construction method comprises the following steps that S1, frame beam-column joint steel bars are installed; S11, bottom plate frame beam-column joint steel bars are installed; s12, middle-layerplate and top plate frame beam-column joint steel bars are installed; S2, core column additional steel bars 1 are installed and fixed; S3, construction joints are divided; S4, core area concrete construction; and S5, construction joints are treated. A frame structure beam-column joint core area and structural slabs are synchronously constructed, the construction method is advanced, the construction speed is high, the construction quality is greatly improved, and the construction cost is saved. The frame structure beam-column joint core area construction method is mainly applied to frame structure beam-column joint core area construction.
本发明涉及梁柱施工技术领域,更具体而言,涉及框架结构梁柱节点核心区施工工法。包括以下步骤:S1、框架梁柱节点钢筋安装:S11、底板框架梁柱节点钢筋安装;S12、中层板及顶板框架梁柱节点钢筋安装;S2、芯柱附加钢筋1安装及固定;S3、施工缝划分;S4、核心区混凝土施工;S5、施工缝处理。框架梁柱节点核心区与结构板同步施工工法技术先进,施工速度快,大大提高了施工质量且节约了施工成本。本发明主要应用于框架结构梁柱节点核心区施工。
Frame structure beam-column joint core area construction method
框架结构梁柱节点核心区施工工法
WANG LICHUANG (author) / WANG DONGSHENG (author) / LI PENG (author) / YAN ZHENGKUN (author) / XU BING (author) / DING XIANGLONG (author) / WANG ZHE (author) / WEI WEI (author) / HU JIHUI (author) / REN ZHIQIN (author)
2021-03-09
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Seismic strengthening method for frame beam-column joint core area
European Patent Office | 2016
|Construction method of complicated beam column joint core area
European Patent Office | 2016
|Beam column joint in frame structure and construction method thereof
European Patent Office | 2022
|European Patent Office | 2022
|Frame beam column connecting joint structure and construction method thereof
European Patent Office | 2022
|