A platform for research: civil engineering, architecture and urbanism
Slippage construction deviation rectifying device and slippage deviation rectifying method
The invention relates to a slippage construction deviation rectifying device and a slippage deviation rectifying method. The slippage construction deviation rectifying device comprises a main cross beam, one end of the main cross beam is connected with a rear embedded part, a square pipe is arranged above the main cross beam, a round pipe is arranged below the main cross beam, a horizontal hydraulic jack and a supporting round pipe are further arranged on the square pipe, and a vertical hydraulic jack and the other supporting round pipe are further arranged on the main cross beam. The method specifically comprises the following steps that firstly, an offset support is pushed in the vertical direction to correct the deviation in the vertical direction, and then is pushed in the horizontal direction to correct the deviation in the horizontal direction. Compared with the prior art, the device and the method have the advantages that common materials and equipment are adopted, the whole structure is safe and reliable, the device is suitable for long-distance deviation rectification of a large-span truss structure and a space truss structure, the matching method is simple and direct, andoperation is easy, convenient and not complex.
本发明涉及一种滑移施工纠偏装置及滑移纠偏方法,其中,装置包括主横梁,所述主横梁的一端与后置埋件相连接,所述主横梁的上方设有方管,所述主横梁的下方设有圆管,所述方管上还设有水平液压千斤顶和支撑圆管,所述主横梁上还设有竖向液压千斤顶以及另一所述支撑圆管。方法具体包括针对偏移支座先进行竖直方向的顶推以修正竖直方向的偏差,然后进行水平方向的顶推以修正水平方向的偏差。与现有技术相比,本发明具有装置组成均采用常用材料和设备,整体结构安全可靠,并且适用于大跨度桁架结构和空间网架结构的长距离纠偏,配套方法简单直接,操作简便不复杂等优点。
Slippage construction deviation rectifying device and slippage deviation rectifying method
The invention relates to a slippage construction deviation rectifying device and a slippage deviation rectifying method. The slippage construction deviation rectifying device comprises a main cross beam, one end of the main cross beam is connected with a rear embedded part, a square pipe is arranged above the main cross beam, a round pipe is arranged below the main cross beam, a horizontal hydraulic jack and a supporting round pipe are further arranged on the square pipe, and a vertical hydraulic jack and the other supporting round pipe are further arranged on the main cross beam. The method specifically comprises the following steps that firstly, an offset support is pushed in the vertical direction to correct the deviation in the vertical direction, and then is pushed in the horizontal direction to correct the deviation in the horizontal direction. Compared with the prior art, the device and the method have the advantages that common materials and equipment are adopted, the whole structure is safe and reliable, the device is suitable for long-distance deviation rectification of a large-span truss structure and a space truss structure, the matching method is simple and direct, andoperation is easy, convenient and not complex.
本发明涉及一种滑移施工纠偏装置及滑移纠偏方法,其中,装置包括主横梁,所述主横梁的一端与后置埋件相连接,所述主横梁的上方设有方管,所述主横梁的下方设有圆管,所述方管上还设有水平液压千斤顶和支撑圆管,所述主横梁上还设有竖向液压千斤顶以及另一所述支撑圆管。方法具体包括针对偏移支座先进行竖直方向的顶推以修正竖直方向的偏差,然后进行水平方向的顶推以修正水平方向的偏差。与现有技术相比,本发明具有装置组成均采用常用材料和设备,整体结构安全可靠,并且适用于大跨度桁架结构和空间网架结构的长距离纠偏,配套方法简单直接,操作简便不复杂等优点。
Slippage construction deviation rectifying device and slippage deviation rectifying method
一种滑移施工纠偏装置及滑移纠偏方法
JI DENGHUI (author) / ZHANG HAOQING (author) / JI CHENG (author) / YUAN WEIDONG (author) / ZHANG WENZHONG (author) / WANG TIANYU (author) / GU WEIPING (author) / YE SI (author)
2021-03-12
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Maritime work slippage deviation rectifying device, system and method
European Patent Office | 2021
|Building deviation rectifying structure and deviation rectifying method
European Patent Office | 2021
|Pier column deviation rectifying device and deviation rectifying method
European Patent Office | 2023
|Prestressed space structure deviation rectifying device and deviation rectifying method
European Patent Office | 2024
|