A platform for research: civil engineering, architecture and urbanism
Construction method of shear wall water supply pipeline pressing groove
A construction method of a shear wall water supply pipeline pressing groove comprises the steps that (1) the horizontal distance and the vertical height between a water supply point and a shear wall corner are determined; 2) a groove pressing steel pipe is selected according to the pipe diameter of the water supply pipeline, and enabling the length of the groove pressing steel pipe to be 5cm longer than the vertical height; 3) the channeling steel pipe is bisected along the length direction to obtain a half pipe, and plugging openings at two ends of the half pipe; 4) a template of the shear wall surface is determined corresponding to the mold; (5) according to the formwork determined in the step (4), in combination with the horizontal distance determined in the step (1), the half pipes with the two blocked ends obtained in the step (3) are fixed to the corresponding formwork through bolts, and reinforcing steel bars are arranged; and 6) the die is assembled, concrete is poured, and thedie is removed after the concrete is formed, thereby obtaining the shear wall with the water supply pipeline pressing groove. The method is convenient to construct and high in efficiency, can be repeatedly used with a mold for forming the shear wall, reduces the labor intensity of workers, guarantees the installation quality, and is a green construction method.
一种剪力墙给水管道压槽的施工方法,包括步骤:1)确定给水点距离剪力墙墙角的水平距离和垂直高度;2)根据给水管道的管径选择压槽钢管,使压槽钢管的长度比垂直高度长5cm;3)将压槽钢管沿长度方向对剖,得到半管,半管两端的开口封堵;4)确定模具对应剪力墙面的模板;5)根据步骤4)确定的模板,结合步骤1)确定的水平距离,将步骤3)得到的两端封堵的半管通过螺栓固定在对应的模板上,布置钢筋;6)合模,浇注混凝土,待混凝土成型后,拆模,得到具有给水管道压槽的剪力墙。本发明施工方便、效率高,与成型剪力墙的模具可重复使用,降低人工劳动强度、保证安装质量,是一种绿色的施工方法。
Construction method of shear wall water supply pipeline pressing groove
A construction method of a shear wall water supply pipeline pressing groove comprises the steps that (1) the horizontal distance and the vertical height between a water supply point and a shear wall corner are determined; 2) a groove pressing steel pipe is selected according to the pipe diameter of the water supply pipeline, and enabling the length of the groove pressing steel pipe to be 5cm longer than the vertical height; 3) the channeling steel pipe is bisected along the length direction to obtain a half pipe, and plugging openings at two ends of the half pipe; 4) a template of the shear wall surface is determined corresponding to the mold; (5) according to the formwork determined in the step (4), in combination with the horizontal distance determined in the step (1), the half pipes with the two blocked ends obtained in the step (3) are fixed to the corresponding formwork through bolts, and reinforcing steel bars are arranged; and 6) the die is assembled, concrete is poured, and thedie is removed after the concrete is formed, thereby obtaining the shear wall with the water supply pipeline pressing groove. The method is convenient to construct and high in efficiency, can be repeatedly used with a mold for forming the shear wall, reduces the labor intensity of workers, guarantees the installation quality, and is a green construction method.
一种剪力墙给水管道压槽的施工方法,包括步骤:1)确定给水点距离剪力墙墙角的水平距离和垂直高度;2)根据给水管道的管径选择压槽钢管,使压槽钢管的长度比垂直高度长5cm;3)将压槽钢管沿长度方向对剖,得到半管,半管两端的开口封堵;4)确定模具对应剪力墙面的模板;5)根据步骤4)确定的模板,结合步骤1)确定的水平距离,将步骤3)得到的两端封堵的半管通过螺栓固定在对应的模板上,布置钢筋;6)合模,浇注混凝土,待混凝土成型后,拆模,得到具有给水管道压槽的剪力墙。本发明施工方便、效率高,与成型剪力墙的模具可重复使用,降低人工劳动强度、保证安装质量,是一种绿色的施工方法。
Construction method of shear wall water supply pipeline pressing groove
一种剪力墙给水管道压槽的施工方法
WU JIANGUO (author) / LI KE (author) / DENG LU (author) / XIONG XINGQIANG (author) / RAN QIGANG (author)
2021-03-16
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Water supply pipe groove pressing mold based on template construction
European Patent Office | 2024
|Groove backfilling device for water supply and drainage pipeline construction
European Patent Office | 2023
|European Patent Office | 2024
|European Patent Office | 2023
|Pipeline groove supporting structure and pipeline construction method
European Patent Office | 2023
|