A platform for research: civil engineering, architecture and urbanism
Protection structure for excavating foundation pit overpass existing tunnel and construction method thereof
The invention provides a protection structure for excavating a foundation pit overpass existing tunnel and a construction method thereof. The protection structure comprises a plurality of uplift piles, two top beams and a plurality of supporting steel pipes, wherein the uplift piles are arranged in two rows, the two rows of uplift piles are correspondingly and vertically arranged on the two sidesof the existing tunnel, the arrangement direction of the uplift piles in each row is consistent with the length direction of the tunnel, and a gap is formed between every two adjacent uplift piles ineach row; one top beam is arranged at the top of each row of uplift piles, and one top beam is connected with all uplift piles in one row; and the multiple supporting steel pipes are all transverselyarranged above the existing tunnel, the two ends of each supporting steel pipe are correspondingly connected with the two top beams, the multiple supporting steel pipes are arranged in sequence, and every two adjacent supporting steel pipes are connected to enable the multiple supporting steel pipes to form an overall reinforced structure. According to the technical scheme, the protection structure for excavating the foundation pit overpass existing tunnel is suitable for overpass foundation pit construction of various stratums; and the deformation of rail transit and municipal pipelines can be effectively controlled, and the construction cost is reduced.
本发明提供了一种开挖基坑上跨既有隧道的保护结构及其施工方法,其中保护结构包括:若干抗拔桩,若干抗拔桩形成两排,两排抗拔桩分别竖直设置在既有隧道的两侧,每排内抗拔桩的排列方向与隧道的长度方向一致,每排内相邻的两个抗拔桩之间具有间隔;两个冠梁,在每排抗拔桩的顶部均设置有一个冠梁,一个冠梁与一排内的所有抗拔桩均连接;若干支护钢管,若干支护钢管均横向设置于既有隧道的上方,每根支护钢管的两端分别与两个冠梁连接,若干支护钢管依次排列,每相邻的两根支护钢管均相连接以使若干支护钢管形成整体加固结构。本发明提出的技术方案,适用各种地层的上跨基坑施工;能有效控制轨道交通、市政管道的变形,降低工程造价。
Protection structure for excavating foundation pit overpass existing tunnel and construction method thereof
The invention provides a protection structure for excavating a foundation pit overpass existing tunnel and a construction method thereof. The protection structure comprises a plurality of uplift piles, two top beams and a plurality of supporting steel pipes, wherein the uplift piles are arranged in two rows, the two rows of uplift piles are correspondingly and vertically arranged on the two sidesof the existing tunnel, the arrangement direction of the uplift piles in each row is consistent with the length direction of the tunnel, and a gap is formed between every two adjacent uplift piles ineach row; one top beam is arranged at the top of each row of uplift piles, and one top beam is connected with all uplift piles in one row; and the multiple supporting steel pipes are all transverselyarranged above the existing tunnel, the two ends of each supporting steel pipe are correspondingly connected with the two top beams, the multiple supporting steel pipes are arranged in sequence, and every two adjacent supporting steel pipes are connected to enable the multiple supporting steel pipes to form an overall reinforced structure. According to the technical scheme, the protection structure for excavating the foundation pit overpass existing tunnel is suitable for overpass foundation pit construction of various stratums; and the deformation of rail transit and municipal pipelines can be effectively controlled, and the construction cost is reduced.
本发明提供了一种开挖基坑上跨既有隧道的保护结构及其施工方法,其中保护结构包括:若干抗拔桩,若干抗拔桩形成两排,两排抗拔桩分别竖直设置在既有隧道的两侧,每排内抗拔桩的排列方向与隧道的长度方向一致,每排内相邻的两个抗拔桩之间具有间隔;两个冠梁,在每排抗拔桩的顶部均设置有一个冠梁,一个冠梁与一排内的所有抗拔桩均连接;若干支护钢管,若干支护钢管均横向设置于既有隧道的上方,每根支护钢管的两端分别与两个冠梁连接,若干支护钢管依次排列,每相邻的两根支护钢管均相连接以使若干支护钢管形成整体加固结构。本发明提出的技术方案,适用各种地层的上跨基坑施工;能有效控制轨道交通、市政管道的变形,降低工程造价。
Protection structure for excavating foundation pit overpass existing tunnel and construction method thereof
一种开挖基坑上跨既有隧道的保护结构及其施工方法
TIAN SHUAI (author) / LIN YUNHONG (author) / CHANG RUICHENG (author) / MA DONG (author) / GUO XIAODONG (author) / YU WENLONG (author) / LI ZHIJUN (author) / CHEN PENGFEI (author) / WANG GUANGCHAO (author) / FENG HUI (author)
2021-03-19
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of overpass existing city tunnel section protection system
European Patent Office | 2023
|European Patent Office | 2022
|Construction method for protecting overpass structure around deep foundation pits
European Patent Office | 2021
|Overpass existing route steel beam suspension splicing construction method
European Patent Office | 2021
|