A platform for research: civil engineering, architecture and urbanism
Earth compactness pit digging equipment
The invention discloses earthwork compactness pit digging equipment. The earthwork compactness pit digging equipment comprises a fixing mechanism, a soil taking mechanism, a moving mechanism and a digging mechanism which is driven by a motor; the fixing mechanism comprises a bottom plate and a guiding rod fixed on the bottom plate; a hollow part is formed in the middle of the bottom plate; the soil taking mechanism comprises a soil taking base plate, a columnar channel, a soil collecting platform and baffles; the soil taking base plate is connected with the columnar channel and fixed to the bottom plate; one end of the columnar channel corresponds to the hollowed part of the bottom plate; the other end of the columnar channel is a slope opening; the periphery of the slope opening is connected with the soil collecting platform; the baffles are arranged on the periphery of the soil collecting platform; a soil taking opening is formed in the lower side of the soil collecting platform; themoving mechanism slides up and down along the guiding rod and is positioned above the soil taking mechanism; the digging mechanism is supported above the moving mechanism; and a motor driving deviceis arranged in the digging mechanism. According to the equipment, the working efficiency of pit digging for compactness detection based on the sand replacement method is improved, time and labor are saved, the pit digging standard is met, and the test result accuracy is improved.
本发明公开了一种土方压实度挖坑的设备,包括固定机构、取土机构、移动机构和由电机驱动的挖掘机构;固定机构包括底板和固定在底板上的导向杆,底板中间设有镂空部;取土机构包括取土基板、柱状通道、收土平台和挡板,取土基板连接柱状通道固定在底板上,柱状通道一端对应所述底板镂空部,另一端为斜面开口,斜面开口外围连接收土平台,挡板设在所述收土平台外围,收土平台下侧设有取土口;所述移动机构沿所述导向杆上下滑动,移动机构位于所述取土机构上方;挖掘机构支撑于所述移动机构上方,所述挖掘机构内置有电机驱动装置。本发明具体解决提高罐砂法检测压实度挖坑的工作效率,省时省力,符合挖坑标准,提高试验结果准确性的目的。
Earth compactness pit digging equipment
The invention discloses earthwork compactness pit digging equipment. The earthwork compactness pit digging equipment comprises a fixing mechanism, a soil taking mechanism, a moving mechanism and a digging mechanism which is driven by a motor; the fixing mechanism comprises a bottom plate and a guiding rod fixed on the bottom plate; a hollow part is formed in the middle of the bottom plate; the soil taking mechanism comprises a soil taking base plate, a columnar channel, a soil collecting platform and baffles; the soil taking base plate is connected with the columnar channel and fixed to the bottom plate; one end of the columnar channel corresponds to the hollowed part of the bottom plate; the other end of the columnar channel is a slope opening; the periphery of the slope opening is connected with the soil collecting platform; the baffles are arranged on the periphery of the soil collecting platform; a soil taking opening is formed in the lower side of the soil collecting platform; themoving mechanism slides up and down along the guiding rod and is positioned above the soil taking mechanism; the digging mechanism is supported above the moving mechanism; and a motor driving deviceis arranged in the digging mechanism. According to the equipment, the working efficiency of pit digging for compactness detection based on the sand replacement method is improved, time and labor are saved, the pit digging standard is met, and the test result accuracy is improved.
本发明公开了一种土方压实度挖坑的设备,包括固定机构、取土机构、移动机构和由电机驱动的挖掘机构;固定机构包括底板和固定在底板上的导向杆,底板中间设有镂空部;取土机构包括取土基板、柱状通道、收土平台和挡板,取土基板连接柱状通道固定在底板上,柱状通道一端对应所述底板镂空部,另一端为斜面开口,斜面开口外围连接收土平台,挡板设在所述收土平台外围,收土平台下侧设有取土口;所述移动机构沿所述导向杆上下滑动,移动机构位于所述取土机构上方;挖掘机构支撑于所述移动机构上方,所述挖掘机构内置有电机驱动装置。本发明具体解决提高罐砂法检测压实度挖坑的工作效率,省时省力,符合挖坑标准,提高试验结果准确性的目的。
Earth compactness pit digging equipment
一种土方压实度挖坑的设备
MA SHIXUAN (author) / XU XINSHUI (author)
2021-03-23
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Roadbed compactness water injection type pit digging volume detection device
European Patent Office | 2022
|