A platform for research: civil engineering, architecture and urbanism
Bridge pile foundation reinforcement cage positioning combined fixture and using method thereof
The invention relates to a bridge pile foundation reinforcement cage positioning combined fixture and a construction and using method thereof. Compared with the prior art, the bridge pile foundation reinforcement cage positioning combined fixture mainly has the following advantages that reinforcement cages can be accurately positioned, and errors are ensured within the design and specification allowed range; the reinforcement cages can be effectively prevented from floating upwards, the length of the reinforcement cages in a poured bored pile is guaranteed, and circulating hanging bars are adopted, so that waste of raw materials is reduced, the later pile head cutting difficulty is reduced, and the situation that a pile head can be integrally hoisted in an annular cutting mode is guaranteed..
本发明涉及一种桥梁桩基钢筋笼定位组合卡具及其施工使用方法,本发明与现有技术相比,主要有以下优势:可以进行准确地钢筋笼定位,保证误差在设计及规范允许范围内;可以有效的防止钢筋笼上浮,保证浇筑完成后的钻孔桩内钢筋笼长度,采用循环吊筋,一是减少原材料的浪费,二是减少后期桩头截取难度,保证桩头可以整体环切吊装。
Bridge pile foundation reinforcement cage positioning combined fixture and using method thereof
The invention relates to a bridge pile foundation reinforcement cage positioning combined fixture and a construction and using method thereof. Compared with the prior art, the bridge pile foundation reinforcement cage positioning combined fixture mainly has the following advantages that reinforcement cages can be accurately positioned, and errors are ensured within the design and specification allowed range; the reinforcement cages can be effectively prevented from floating upwards, the length of the reinforcement cages in a poured bored pile is guaranteed, and circulating hanging bars are adopted, so that waste of raw materials is reduced, the later pile head cutting difficulty is reduced, and the situation that a pile head can be integrally hoisted in an annular cutting mode is guaranteed..
本发明涉及一种桥梁桩基钢筋笼定位组合卡具及其施工使用方法,本发明与现有技术相比,主要有以下优势:可以进行准确地钢筋笼定位,保证误差在设计及规范允许范围内;可以有效的防止钢筋笼上浮,保证浇筑完成后的钻孔桩内钢筋笼长度,采用循环吊筋,一是减少原材料的浪费,二是减少后期桩头截取难度,保证桩头可以整体环切吊装。
Bridge pile foundation reinforcement cage positioning combined fixture and using method thereof
一种桥梁桩基钢筋笼定位组合卡具及其使用方法
ZENG SHOUXIAN (author) / KOU CONGBAO (author) / LIU XISHENG (author) / XU XIANDA (author) / YUE CHONG (author) / ZHAO TING (author)
2021-03-26
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|Positioning fixture for pile foundation reinforcement cage
European Patent Office | 2020
|Bridge pile foundation reinforcement cage positioning device
European Patent Office | 2024
|Bridge pile foundation reinforcement cage center centering positioning system and positioning method
European Patent Office | 2023
|Pile foundation reinforcement cage construction positioning method
European Patent Office | 2021
|