Large-span welded ball net rack ground assembly integral lifting construction method
The invention discloses a large-span welded ball net rack ground assembly integral lifting construction method. The large-span welded ball net rack ground assembly integral lifting construction methodcomprises the steps that a roof system is projected to the ground to determine the space coordinates of all joints, and the position of a lifting point is determined according to the net rack structure form and the lifting load requirement; column head embedded parts are designed, and a platform measure tool is temporarily lifted; finally, a part machining detail drawing for generating a net rackand a temporary lifting platform is generated and used for guiding discharging and field construction; during construction of building a structural concrete column, a temporary lifting platform embedded part is installed on a column head, and pouring of the temporary lifting platform embedded part and column body concrete is completed together; net rack assembling, welding, measuring and detecting work is completed on the ground according to the space coordinates of the deepening design; a lifting platform and lifting equipment are installed on the structural concrete column, a hydraulic lifter serves as a lifting machine tool, and a flexible steel strand serves as a bearing rigging to achieve synchronous lifting of the roof net rack system; a lifter is locked after being lifted to the designed elevation, the rear supplementary rod pieces are assembled in the air, and finally installation of the net rack is completed; and an anti-corrosion and fireproof coating is sprayed.
本发明公开一种大跨度焊接球网架地面拼装整体提升工法,包括:将屋盖体系投射到地面确定各节点空间坐标,据网架结构形式、提升荷载要求确定提升点位置;设计柱头预埋件、临时提升平台措施工装;最后生成生成网架及临时提升平台的零部件加工详图,用于指导下料和现场施工;在建筑结构砼柱的施工时,在柱头安装临时提升平台预埋件,与柱身砼浇筑一并完成;按深化设计的空间坐标在地面完成网架拼装、焊接、测量、检测工作;在结构砼柱上安装提升平台及提升设备,以液压提升器作为提升机具,柔性钢绞线作为承重索具实现屋盖网架系统的同步提升;提升至设计标高后锁定提升器,在空中进行后补杆件的拼装,最终完成网架的安装;进行防腐、防火涂料喷涂。
Large-span welded ball net rack ground assembly integral lifting construction method
The invention discloses a large-span welded ball net rack ground assembly integral lifting construction method. The large-span welded ball net rack ground assembly integral lifting construction methodcomprises the steps that a roof system is projected to the ground to determine the space coordinates of all joints, and the position of a lifting point is determined according to the net rack structure form and the lifting load requirement; column head embedded parts are designed, and a platform measure tool is temporarily lifted; finally, a part machining detail drawing for generating a net rackand a temporary lifting platform is generated and used for guiding discharging and field construction; during construction of building a structural concrete column, a temporary lifting platform embedded part is installed on a column head, and pouring of the temporary lifting platform embedded part and column body concrete is completed together; net rack assembling, welding, measuring and detecting work is completed on the ground according to the space coordinates of the deepening design; a lifting platform and lifting equipment are installed on the structural concrete column, a hydraulic lifter serves as a lifting machine tool, and a flexible steel strand serves as a bearing rigging to achieve synchronous lifting of the roof net rack system; a lifter is locked after being lifted to the designed elevation, the rear supplementary rod pieces are assembled in the air, and finally installation of the net rack is completed; and an anti-corrosion and fireproof coating is sprayed.
本发明公开一种大跨度焊接球网架地面拼装整体提升工法,包括:将屋盖体系投射到地面确定各节点空间坐标,据网架结构形式、提升荷载要求确定提升点位置;设计柱头预埋件、临时提升平台措施工装;最后生成生成网架及临时提升平台的零部件加工详图,用于指导下料和现场施工;在建筑结构砼柱的施工时,在柱头安装临时提升平台预埋件,与柱身砼浇筑一并完成;按深化设计的空间坐标在地面完成网架拼装、焊接、测量、检测工作;在结构砼柱上安装提升平台及提升设备,以液压提升器作为提升机具,柔性钢绞线作为承重索具实现屋盖网架系统的同步提升;提升至设计标高后锁定提升器,在空中进行后补杆件的拼装,最终完成网架的安装;进行防腐、防火涂料喷涂。
Large-span welded ball net rack ground assembly integral lifting construction method
一种大跨度焊接球网架地面拼装整体提升工法
ZHANG BAOPING (author) / CHEN KE (author) / WEN XU (author)
2021-03-26
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Integral lifting construction method for large-span net rack roof structure
European Patent Office | 2020
|European Patent Office | 2021
|Whole lifting process for large-span obliquely-placed quadrangular pyramid welded ball net rack
European Patent Office | 2022
|European Patent Office | 2020
|Large-span steel structure net rack lifting construction method
European Patent Office | 2021
|