A platform for research: civil engineering, architecture and urbanism
Frost heaving resisting, leaking stoppage and reinforcement method for cold region
The invention discloses a frost heaving resisting, leaking stoppage and reinforcement method for a cold region. The frost heaving resisting, leaking stoppage and reinforcement method comprises the following steps that S1, structural defects and cracks and water leakage of tie bar holes are detected, and the structural defects and cracks and the tie bar holes are reported; S2, frost heaving resistance treatment is carried out on surface irregular crack leakage water; S3, water leakage and frost heaving resistance treatment is carried out on construction gaps; S4, leakage water with an incompactstructure is treated; and S5, finally, the surface of the structure is cleaned through a grinding machine on the area with the treatment range enlarged by 30 cm, and a permeable epoxy interface agentis brushed, epoxy putty is used for brushing the area by 10 mm in thickness. Frost heaving resistance and waterproofness are ensured, a comprehensive method of ensuring quality, being advanced in technology, economical, reasonable, safe, applicable, material combination, construction method combination and equipment combination is met, the waterproof design concept in an original design drawing is recovered, the deficiencies in construction are repaired, the construction defects are overcome, the requirements of original design of the waterproof joint are met, relevant national standards, regulations and standards are met, structural safety is ensured, and potential safety hazards of passenger passage are eliminated.
本发明公开了一种寒区的抗冻胀堵漏和加固方法,包括如下步骤:S1、检测结构缺陷和裂缝、拉筋孔渗漏水,并进行报告;S2、对于表面不规则裂缝渗漏水进行抗冻胀处理;S3、接着对于施工缝隙进行漏水抗冻胀处理;S4、对于结构不密实渗漏水进行处理;S5、最后在整治范围扩大30cm的面积上用打磨机清理结构表面,涂刷渗透性环氧界面剂,用环氧腻子在此面积粉刷10mm厚度,确保抗冻胀防水性,符合确保质量、技术先进、经济合理、安全适用,材料组合、工法复合、设备组合综合办法,恢复原来设计图中防水的设计理念,修复施工中的不足,弥补施工的缺陷,满足防水节点原设计的要求,符合国家相关规范、规程、标,确保结构安全和消除旅客通行的安全隐患。
Frost heaving resisting, leaking stoppage and reinforcement method for cold region
The invention discloses a frost heaving resisting, leaking stoppage and reinforcement method for a cold region. The frost heaving resisting, leaking stoppage and reinforcement method comprises the following steps that S1, structural defects and cracks and water leakage of tie bar holes are detected, and the structural defects and cracks and the tie bar holes are reported; S2, frost heaving resistance treatment is carried out on surface irregular crack leakage water; S3, water leakage and frost heaving resistance treatment is carried out on construction gaps; S4, leakage water with an incompactstructure is treated; and S5, finally, the surface of the structure is cleaned through a grinding machine on the area with the treatment range enlarged by 30 cm, and a permeable epoxy interface agentis brushed, epoxy putty is used for brushing the area by 10 mm in thickness. Frost heaving resistance and waterproofness are ensured, a comprehensive method of ensuring quality, being advanced in technology, economical, reasonable, safe, applicable, material combination, construction method combination and equipment combination is met, the waterproof design concept in an original design drawing is recovered, the deficiencies in construction are repaired, the construction defects are overcome, the requirements of original design of the waterproof joint are met, relevant national standards, regulations and standards are met, structural safety is ensured, and potential safety hazards of passenger passage are eliminated.
本发明公开了一种寒区的抗冻胀堵漏和加固方法,包括如下步骤:S1、检测结构缺陷和裂缝、拉筋孔渗漏水,并进行报告;S2、对于表面不规则裂缝渗漏水进行抗冻胀处理;S3、接着对于施工缝隙进行漏水抗冻胀处理;S4、对于结构不密实渗漏水进行处理;S5、最后在整治范围扩大30cm的面积上用打磨机清理结构表面,涂刷渗透性环氧界面剂,用环氧腻子在此面积粉刷10mm厚度,确保抗冻胀防水性,符合确保质量、技术先进、经济合理、安全适用,材料组合、工法复合、设备组合综合办法,恢复原来设计图中防水的设计理念,修复施工中的不足,弥补施工的缺陷,满足防水节点原设计的要求,符合国家相关规范、规程、标,确保结构安全和消除旅客通行的安全隐患。
Frost heaving resisting, leaking stoppage and reinforcement method for cold region
一种寒区的抗冻胀堵漏和加固方法
TANG YINGBO (author) / CHEN SENSEN (author) / CHEN DENG (author) / ZHANG HONGTAO (author) / WANG XIANG (author) / ZHANG KEFEN (author) / WANG JUN (author) / CHEN MENGYUAN (author) / ZHANG ZUOLONG (author) / ZHANG SONGLONG (author)
2021-04-02
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|European Patent Office | 2024
|Foundation pit leaking stoppage construction method and leaking stoppage material
European Patent Office | 2021
|Grouting leaking stoppage equipment with heating function and leaking stoppage method