The invention discloses a road edge stone laying device comprising a bottom plate, idler wheels, a thrust grip, a control box, a stone-fill barrel, a stone discharging hopper, a right-angle plate, a stone-fill opening, a trapezoidal strip, a pushing device and a guiding device; the idler wheels are mounted at the four corners of the bottom of the bottom plate respectively, the thrust grip is mounted on the front side of the bottom plate, and the control box is mounted on the upper portion of the bottom plate; and the stone-fill barrel is fixed to the right side of the bottom plate through the right-angle plate, the stone discharging hopper is welded to the top of the stone-fill barrel, the stone pushing opening is formed in the bottom of the stone-fill barrel in the left-right direction, the trapezoidal strip is fixed to the bottom plate in the middle of the stone pushing opening, the pushing device is mounted on the upper portion of the bottom plate, and the guiding device is mounted at the right end. The working mode that a traditional crane is used for placing road traffic stones is changed, the road traffic stones are placed in order, excessive adjustment is not needed, and the road traffic stone placing efficiency is improved.
本发明公开了一种道路路沿石铺设装置,包括底板、滚轮、推力握把、控制箱、堆石筒、下石斗、直角板、推石口、梯形条、推动装置、导向装置,所述底板底部四角分别安装有滚轮,所述底板前侧安装有推力握把,所述底板上部安装有控制箱,所述堆石筒通过直角板固定在底板右侧,所述堆石筒顶部焊接有下石斗,所述堆石筒底部左右方向开有推石口,所述推石口中部的底板上固定有梯形条,所述底板上部安装有推动装置,且右端安装有导向装置。本发明改变了传统吊车放置路沿石的工作方式,使路沿石放置有序,无需过度调整,增加路沿石摆放效率。
The invention discloses a road edge stone laying device comprising a bottom plate, idler wheels, a thrust grip, a control box, a stone-fill barrel, a stone discharging hopper, a right-angle plate, a stone-fill opening, a trapezoidal strip, a pushing device and a guiding device; the idler wheels are mounted at the four corners of the bottom of the bottom plate respectively, the thrust grip is mounted on the front side of the bottom plate, and the control box is mounted on the upper portion of the bottom plate; and the stone-fill barrel is fixed to the right side of the bottom plate through the right-angle plate, the stone discharging hopper is welded to the top of the stone-fill barrel, the stone pushing opening is formed in the bottom of the stone-fill barrel in the left-right direction, the trapezoidal strip is fixed to the bottom plate in the middle of the stone pushing opening, the pushing device is mounted on the upper portion of the bottom plate, and the guiding device is mounted at the right end. The working mode that a traditional crane is used for placing road traffic stones is changed, the road traffic stones are placed in order, excessive adjustment is not needed, and the road traffic stone placing efficiency is improved.
本发明公开了一种道路路沿石铺设装置,包括底板、滚轮、推力握把、控制箱、堆石筒、下石斗、直角板、推石口、梯形条、推动装置、导向装置,所述底板底部四角分别安装有滚轮,所述底板前侧安装有推力握把,所述底板上部安装有控制箱,所述堆石筒通过直角板固定在底板右侧,所述堆石筒顶部焊接有下石斗,所述堆石筒底部左右方向开有推石口,所述推石口中部的底板上固定有梯形条,所述底板上部安装有推动装置,且右端安装有导向装置。本发明改变了传统吊车放置路沿石的工作方式,使路沿石放置有序,无需过度调整,增加路沿石摆放效率。
Road edge stone laying device
一种道路路沿石铺设装置
LIU LIXIA (author)
2021-04-09
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Intelligent automatic road edge stone integrated laying device
European Patent Office | 2021
|