A platform for research: civil engineering, architecture and urbanism
Concrete pouring equipment for building roof pouring and working method of concrete pouring equipment
The invention discloses concrete pouring equipment for building roof pouring, and belongs to the technical field of concrete pouring equipment. The concrete pouring equipment comprises a discharging pipe, a guiding device is arranged on the outer wall of the bottom of the discharging pipe, a supporting rod is fixedly mounted between the inner walls of the left side and the right side of the guiding device, and a mounting rod is fixedly mounted on the outer wall of the bottom of the supporting rod. Guiding plates are arranged on the outer walls of the left side and the right side of the mounting rod correspondingly, the cross sections of the guiding plates are semicircular, falling concrete is guided through the guiding plates, the concrete collides with the inner walls of the guiding devices, the falling impact force of the concrete is reduced, and supporting springs stretch out and draw back to enable the guiding plates to swing up and down. The impact force generated when concrete falls onto the guiding plates is buffered and weakened, so that the impact force on a formwork during concrete pouring is further reduced, the position of the discharging pipe does not need to be too close to the building formwork, and the situation that the local area of the building formwork is damaged due to excessive concentration during concrete pouring is avoided.
本发明公开了混凝土浇筑设备技术领域的一种用于建筑屋顶浇筑的混凝土浇筑设备,包括下料管,所述下料管底部外壁设置有导向装置,所述导向装置左右两侧内壁之间固定安装有支撑杆,且支撑杆底部外壁固定安装有安装杆,所述安装杆左右两侧外壁均设置有导向板,所述导向板的横截面呈半圆形,装置中通过导向板对下落的混凝土进行导向,使混凝土碰撞到导向装置的内壁上,减小混凝土下落的冲击力,并且支撑弹簧伸缩,使导向板上下摆动,对混凝土落到导向板上的冲击力进行缓冲减弱,从而进一步降低混凝土浇筑时对模板造成的冲击力,从而使下料管位置不需要离建筑模板太近,避免混凝土浇筑时过于集中而对建筑模板的局部区域造成损坏。
Concrete pouring equipment for building roof pouring and working method of concrete pouring equipment
The invention discloses concrete pouring equipment for building roof pouring, and belongs to the technical field of concrete pouring equipment. The concrete pouring equipment comprises a discharging pipe, a guiding device is arranged on the outer wall of the bottom of the discharging pipe, a supporting rod is fixedly mounted between the inner walls of the left side and the right side of the guiding device, and a mounting rod is fixedly mounted on the outer wall of the bottom of the supporting rod. Guiding plates are arranged on the outer walls of the left side and the right side of the mounting rod correspondingly, the cross sections of the guiding plates are semicircular, falling concrete is guided through the guiding plates, the concrete collides with the inner walls of the guiding devices, the falling impact force of the concrete is reduced, and supporting springs stretch out and draw back to enable the guiding plates to swing up and down. The impact force generated when concrete falls onto the guiding plates is buffered and weakened, so that the impact force on a formwork during concrete pouring is further reduced, the position of the discharging pipe does not need to be too close to the building formwork, and the situation that the local area of the building formwork is damaged due to excessive concentration during concrete pouring is avoided.
本发明公开了混凝土浇筑设备技术领域的一种用于建筑屋顶浇筑的混凝土浇筑设备,包括下料管,所述下料管底部外壁设置有导向装置,所述导向装置左右两侧内壁之间固定安装有支撑杆,且支撑杆底部外壁固定安装有安装杆,所述安装杆左右两侧外壁均设置有导向板,所述导向板的横截面呈半圆形,装置中通过导向板对下落的混凝土进行导向,使混凝土碰撞到导向装置的内壁上,减小混凝土下落的冲击力,并且支撑弹簧伸缩,使导向板上下摆动,对混凝土落到导向板上的冲击力进行缓冲减弱,从而进一步降低混凝土浇筑时对模板造成的冲击力,从而使下料管位置不需要离建筑模板太近,避免混凝土浇筑时过于集中而对建筑模板的局部区域造成损坏。
Concrete pouring equipment for building roof pouring and working method of concrete pouring equipment
一种用于建筑屋顶浇筑的混凝土浇筑设备及其工作方法
WANG XIAOPING (author)
2021-04-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
House building concrete pouring equipment and pouring method
European Patent Office | 2024
|European Patent Office | 2022
|