A platform for research: civil engineering, architecture and urbanism
Rock-fill dam continuous compaction control method
The invention discloses a rock-fill dam continuous compaction control method. The rock-fill dam continuous compaction control method comprises the following steps of equipment inspection, correlation verification, process control and quality detection. According to the invention, the loading device is provided with the measuring device, the measuring device is used for analyzing and processing through a preset program to obtain the compaction degree value, and the compaction degree value is displayed on the data acquisition and display device as a result, so that a driver can conveniently know compaction information at any time and continuously detect and evaluate the compaction quality, and the construction process can be optimized. The phenomena of excessive rolling compaction and insufficient rolling compaction are avoided, the construction efficiency is improved, the construction cost is saved, a traditional sampling control mode is changed through a continuous compaction control technology, the rockfill dam construction efficiency is improved, and the compaction quality of a rockfill dam rolling compaction layer can be more effectively controlled and improved.
本发明公开一种堆石坝连续压实控制方法,其方法包括以下步骤:设备检查、相关性校验、过程控制和质量检测;本发明在加载设备上安装加量测设备,并通过量测设备经预先设定程序进行分析处理得到压实度值,将其作为结果显示在数据采集与显示装置上,从而便于驾驶员随时了解压实信息,连续性地对压实质量进行检测评估,可以优化施工过程,避免过度碾压和碾压不足的现象,提高施工效率,节约施工成本,通过连续压实控制技术改变了传统意义上的抽样控制方式,不但提高了堆石坝建筑效率,还能更有效地控制和提高堆石坝碾压层的压实质量。
Rock-fill dam continuous compaction control method
The invention discloses a rock-fill dam continuous compaction control method. The rock-fill dam continuous compaction control method comprises the following steps of equipment inspection, correlation verification, process control and quality detection. According to the invention, the loading device is provided with the measuring device, the measuring device is used for analyzing and processing through a preset program to obtain the compaction degree value, and the compaction degree value is displayed on the data acquisition and display device as a result, so that a driver can conveniently know compaction information at any time and continuously detect and evaluate the compaction quality, and the construction process can be optimized. The phenomena of excessive rolling compaction and insufficient rolling compaction are avoided, the construction efficiency is improved, the construction cost is saved, a traditional sampling control mode is changed through a continuous compaction control technology, the rockfill dam construction efficiency is improved, and the compaction quality of a rockfill dam rolling compaction layer can be more effectively controlled and improved.
本发明公开一种堆石坝连续压实控制方法,其方法包括以下步骤:设备检查、相关性校验、过程控制和质量检测;本发明在加载设备上安装加量测设备,并通过量测设备经预先设定程序进行分析处理得到压实度值,将其作为结果显示在数据采集与显示装置上,从而便于驾驶员随时了解压实信息,连续性地对压实质量进行检测评估,可以优化施工过程,避免过度碾压和碾压不足的现象,提高施工效率,节约施工成本,通过连续压实控制技术改变了传统意义上的抽样控制方式,不但提高了堆石坝建筑效率,还能更有效地控制和提高堆石坝碾压层的压实质量。
Rock-fill dam continuous compaction control method
一种堆石坝连续压实控制方法
LI YONGYE (author) / LI ZHIGANG (author) / MA ZHONGXIANG (author) / WANG XIAODONG (author) / ZHANG GUOMING (author) / FENG WENTAO (author) / SUN XINJIAN (author) / HUANG YAN (author) / SHENG SHANLIN (author) / LI WANFENG (author)
2021-04-13
Patent
Electronic Resource
Chinese
Compaction and control of earth fill & rock fill dams
Tema Archive | 2009
|Vibratory soil and rock fill compaction
TIBKAT | 1981
|Vibratory soil and rock fill compaction
UB Braunschweig | 1981
|Compaction of earth and rock-fill dams
Engineering Index Backfile | 1960
|Compaction of rock fill during flow-line construction of dams
Springer Verlag | 1992
|