A platform for research: civil engineering, architecture and urbanism
Retaining wall drainage method and retaining wall drainage system
The invention relates to a retaining wall drainage method and a retaining wall drainage system. The retaining wall drainage method comprises the following steps that when an original drainage hole in a retaining wall is blocked, a drainage well is arranged in a soil body blocked by the retaining wall along the longitudinal direction; the originally blocked water drainage hole is selected as a foundation hole, a water guide pipe is inserted into the foundation hole, and the water guide pipe is anchored into the drainage well, so that the water guide pipe can guide out water in the drainage well; therefore, the purpose of draining is achieved, and water drainage capacity of the retaining wall is recovered. Moreover, in the process of recovering the water drainage capacity of the retaining wall, and the originally blocked water drainage hole is directly used as the foundation hole, so that the cost required for recovering the water drainage capacity of the retaining wall is effectively reduced, and meanwhile, the whole process is simpler and easier to implement. Moreover, by adopting the drainage well and the water guide pipe, the water drainage capacity of the retaining wall can be recovered for a long time, and the retaining wall is not easy to block.
本发明涉及一种挡墙泄水方法和挡墙泄水系统,所述挡墙泄水方法包括以下步骤:当挡墙上原有泄水孔被堵塞时,在挡墙所阻挡的土体中沿纵向设置疏干井;选取原来被堵塞的泄水孔作为基础孔,并在所述基础孔中插入导水管,将所述导水管锚入所述疏干井中,使得所述导水管能够将所述疏干井中的水导出。从而达到泄水的目的,恢复所述挡墙的泄水能力。而且,在恢复所述挡墙泄水能力的过程中,直接利用原来被堵塞的泄水孔作为基础孔,有效降低恢复所述挡墙泄水能力所需成本,同时也使得整个过程更加简单易行。而且,采用所述疏干井和所述导水管的方式,能够使得所述挡墙恢复的泄水能力维持时间较长,不易被堵塞。
Retaining wall drainage method and retaining wall drainage system
The invention relates to a retaining wall drainage method and a retaining wall drainage system. The retaining wall drainage method comprises the following steps that when an original drainage hole in a retaining wall is blocked, a drainage well is arranged in a soil body blocked by the retaining wall along the longitudinal direction; the originally blocked water drainage hole is selected as a foundation hole, a water guide pipe is inserted into the foundation hole, and the water guide pipe is anchored into the drainage well, so that the water guide pipe can guide out water in the drainage well; therefore, the purpose of draining is achieved, and water drainage capacity of the retaining wall is recovered. Moreover, in the process of recovering the water drainage capacity of the retaining wall, and the originally blocked water drainage hole is directly used as the foundation hole, so that the cost required for recovering the water drainage capacity of the retaining wall is effectively reduced, and meanwhile, the whole process is simpler and easier to implement. Moreover, by adopting the drainage well and the water guide pipe, the water drainage capacity of the retaining wall can be recovered for a long time, and the retaining wall is not easy to block.
本发明涉及一种挡墙泄水方法和挡墙泄水系统,所述挡墙泄水方法包括以下步骤:当挡墙上原有泄水孔被堵塞时,在挡墙所阻挡的土体中沿纵向设置疏干井;选取原来被堵塞的泄水孔作为基础孔,并在所述基础孔中插入导水管,将所述导水管锚入所述疏干井中,使得所述导水管能够将所述疏干井中的水导出。从而达到泄水的目的,恢复所述挡墙的泄水能力。而且,在恢复所述挡墙泄水能力的过程中,直接利用原来被堵塞的泄水孔作为基础孔,有效降低恢复所述挡墙泄水能力所需成本,同时也使得整个过程更加简单易行。而且,采用所述疏干井和所述导水管的方式,能够使得所述挡墙恢复的泄水能力维持时间较长,不易被堵塞。
Retaining wall drainage method and retaining wall drainage system
挡墙泄水方法和挡墙泄水系统
HUANG JUNGUANG (author) / LIN ZUKAI (author) / LUO YONGJIAN (author)
2021-04-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
REINFORCEMENT DRAINAGE DEVICE OF RETAINING WALL, AND REINFORCEMENT DRAINAGE METHOD OF RETAINING WALL
European Patent Office | 2023
|RETAINING WALL SYSTEM USING RETAINING WALL BLOCKS FOR EASY DRAINAGE
European Patent Office | 2023
|