A platform for research: civil engineering, architecture and urbanism
Communication tower ladder stand device facilitating use and installation process
The invention discloses a communication tower ladder stand device facilitating use and an installation process, the communication tower ladder stand device facilitating use comprises a protection top cover, a first connection ladder stand device, a second connection ladder stand device and a positioning connection base, the first connection ladder stand device comprises a first sleeve, and the top end of the first sleeve is fixedly connected with a first shaft sleeve, the top end of the first shaft sleeve is fixedly connected with a protection top cover, a door plate mounting groove is formed in the front face of the first sleeve, a second shaft sleeve is fixedly connected to the groove wall of one side of the door plate mounting groove, and the side, away from the groove wall of the door plate mounting groove, of the second shaft sleeve is fixedly connected with a first connecting door. The communication tower ladder stand device has the beneficial effects that a first ladder stand structure and a second ladder stand structure are arranged in the first sleeve and a second sleeve correspondingly and are not affected by the external environment, the danger of climbing of workers is reduced, meanwhile, the workers are secondarily protected through the first sleeve and the second sleeve, and the situation that the workers break away from a ladder stand, and accidents occur is avoided.
本发明公开了一种便于使用的通讯塔爬梯装置及安装工艺,包括保护顶盖、第一连接爬梯装置、第二连接爬梯装置和定位连接底座,所述第一连接爬梯装置包括第一套筒,所述第一套筒顶端固定连接有第一轴套,所述第一轴套顶端固定连接保护顶盖,所述第一套筒正面开设有门板安装槽,所述门板安装槽一侧槽壁固定连接有第二轴套,所述第二轴套远离门板安装槽槽壁的一侧固定连接第一连接门。本发明的有益效果是:第一爬梯结构和第二爬梯结构分别设置第一套筒和第二套筒内部,不受外界环境的影响,降低工作人员攀爬的危险性,同时通过第一套筒和第二套筒对工作人员进行二次保护,防止工作人员脱离爬梯,出现意外。
Communication tower ladder stand device facilitating use and installation process
The invention discloses a communication tower ladder stand device facilitating use and an installation process, the communication tower ladder stand device facilitating use comprises a protection top cover, a first connection ladder stand device, a second connection ladder stand device and a positioning connection base, the first connection ladder stand device comprises a first sleeve, and the top end of the first sleeve is fixedly connected with a first shaft sleeve, the top end of the first shaft sleeve is fixedly connected with a protection top cover, a door plate mounting groove is formed in the front face of the first sleeve, a second shaft sleeve is fixedly connected to the groove wall of one side of the door plate mounting groove, and the side, away from the groove wall of the door plate mounting groove, of the second shaft sleeve is fixedly connected with a first connecting door. The communication tower ladder stand device has the beneficial effects that a first ladder stand structure and a second ladder stand structure are arranged in the first sleeve and a second sleeve correspondingly and are not affected by the external environment, the danger of climbing of workers is reduced, meanwhile, the workers are secondarily protected through the first sleeve and the second sleeve, and the situation that the workers break away from a ladder stand, and accidents occur is avoided.
本发明公开了一种便于使用的通讯塔爬梯装置及安装工艺,包括保护顶盖、第一连接爬梯装置、第二连接爬梯装置和定位连接底座,所述第一连接爬梯装置包括第一套筒,所述第一套筒顶端固定连接有第一轴套,所述第一轴套顶端固定连接保护顶盖,所述第一套筒正面开设有门板安装槽,所述门板安装槽一侧槽壁固定连接有第二轴套,所述第二轴套远离门板安装槽槽壁的一侧固定连接第一连接门。本发明的有益效果是:第一爬梯结构和第二爬梯结构分别设置第一套筒和第二套筒内部,不受外界环境的影响,降低工作人员攀爬的危险性,同时通过第一套筒和第二套筒对工作人员进行二次保护,防止工作人员脱离爬梯,出现意外。
Communication tower ladder stand device facilitating use and installation process
一种便于使用的通讯塔爬梯装置及安装工艺
ZHAO ZHENGPING (author) / YU XUAN (author) / QIAO DAN (author) / XIA ZEXIN (author) / WANG ZHIQUAN (author) / HAN LEITING (author)
2021-04-27
Patent
Electronic Resource
Chinese
Communication tower facilitating component installation and maintenance
European Patent Office | 2021
|