Wind turbine generator anchor bolt assembly installing method
The invention discloses a wind turbine generator anchor bolt assembly installing method. The wind turbine generator anchor bolt assembly installing method comprises the steps that positioning anchor bolt assemblies and common anchor bolt assemblies are prepared; lower anchor plates are installed, the lower anchor plates with supporting bolts installed are placed on the embedded parts through a crane, and the supporting bolts and the embedded parts are fixed; upper anchor plates are installed, the installed upper anchor plates are hoisted to the position over the lower anchor plates through the crane, then positioning anchor bolt assemblies are installed; the common anchor bolt assemblies are installed; and an installed anchor bolt cage is adjusted and fixed. According to the wind turbine generator anchor bolt assembly installing method, the work intensity of constructors can be effectively reduced, and the installation and construction efficiency of the wind turbine generator anchor bolt assemblies is improved.
一种风电机组锚栓组合件安装方法,包括:准备定位锚栓组件和普通锚栓组件;进行下锚板的安装,并通过吊车将安装好支撑螺栓的下锚板放置在预埋件上,并对支撑螺栓和预埋件进行固定;进行上锚板的安装,并用吊车将安装好的上锚板吊至下锚板正上方,然后安装定位锚栓组件;进行普通锚栓组件的安装;对安装好的锚栓笼进行调整和固定。本发明能够有效降低施工人员工作强度,提高风电机组锚栓组合件安装施工效率。
Wind turbine generator anchor bolt assembly installing method
The invention discloses a wind turbine generator anchor bolt assembly installing method. The wind turbine generator anchor bolt assembly installing method comprises the steps that positioning anchor bolt assemblies and common anchor bolt assemblies are prepared; lower anchor plates are installed, the lower anchor plates with supporting bolts installed are placed on the embedded parts through a crane, and the supporting bolts and the embedded parts are fixed; upper anchor plates are installed, the installed upper anchor plates are hoisted to the position over the lower anchor plates through the crane, then positioning anchor bolt assemblies are installed; the common anchor bolt assemblies are installed; and an installed anchor bolt cage is adjusted and fixed. According to the wind turbine generator anchor bolt assembly installing method, the work intensity of constructors can be effectively reduced, and the installation and construction efficiency of the wind turbine generator anchor bolt assemblies is improved.
一种风电机组锚栓组合件安装方法,包括:准备定位锚栓组件和普通锚栓组件;进行下锚板的安装,并通过吊车将安装好支撑螺栓的下锚板放置在预埋件上,并对支撑螺栓和预埋件进行固定;进行上锚板的安装,并用吊车将安装好的上锚板吊至下锚板正上方,然后安装定位锚栓组件;进行普通锚栓组件的安装;对安装好的锚栓笼进行调整和固定。本发明能够有效降低施工人员工作强度,提高风电机组锚栓组合件安装施工效率。
Wind turbine generator anchor bolt assembly installing method
一种风电机组锚栓组合件安装方法
YANG ZHONGGUI (author) / BAI JIE (author) / DU JUNMIN (author) / LIU PING (author) / DING YONGCHUN (author) / ZHAO SHAOYAN (author) / MENG DEMING (author) / TIAN JIANBAO (author) / ZHANG YONG (author) / XUE FEI (author)
2021-04-30
Patent
Electronic Resource
Chinese
Method for installing anchor bolt assembly of offshore wind turbine generator
European Patent Office | 2021
|Anchor bolt installing structure and anchor bolt installing method
European Patent Office | 2020
|ANCHOR BOLT INSTALLING JIG AND ANCHOR BOLT INSTALLING METHOD
European Patent Office | 2024
|Wind driven generator foundation anchor bolt construction method
European Patent Office | 2024
|