A platform for research: civil engineering, architecture and urbanism
The invention discloses a combined electric tower pile foundation, and relates to the technical field of power transmission and transformation engineering equipment. The combined electric tower pile foundation comprises a soil layer, wherein a groove I is formed in the upper end of the soil layer, a foundation bottom layer is poured on the bottom end of the groove I, foundation column grooves are built at the four corners of the upper surface of the foundation bottom layer, reinforcing and fixing layers are arranged on the inner walls of the foundation column grooves, concrete is poured between the foundation column grooves and the reinforcing and fixing layers, and foundation columns are arranged in the reinforcing and fixing layers. According to the combined electric tower pile foundation, the foundation bottom layer is poured on the bottom end of the groove I, so that a certain foundation is laid for the building of the whole pile foundation; and the foundation column grooves and the reinforcing and fixing layers are built on the foundation bottom layer, and after the building is finished, concrete is poured in the groove I, so that the electric tower pile foundation is preferably built, the stability of an electric tower is guaranteed, and the condition that the safe use of the electric tower is influenced because concrete cannot achieve the initial fixing effect on soft soil is avoided.
本发明公开了一种联合电塔桩基础,涉及输变电工程设备技术领域,包括土质层,所述土质层的上端开设有一号槽,所述一号槽的底端浇筑有基础底层,所述基础底层上表面的四个拐角处搭建有基柱槽,所述基柱槽的内壁设置有加强固定层,所述基柱槽与加强固定层之间浇筑有混凝土,所述加强固定层的内部设置有基柱。本发明可以通过在一号槽的底端进行浇筑基础底层,为整体的桩基础的搭建奠定了一定的基础,在基础底层上进行搭建基柱槽与加强固定层,且在搭建结束后,并在一号槽的内部浇筑混凝土,很好地进行搭建电塔的桩基础,保证了电塔的稳定性,避免了在较软的土质上混凝土无法达到最初的固定效果,会影响到电塔的安全使用。
The invention discloses a combined electric tower pile foundation, and relates to the technical field of power transmission and transformation engineering equipment. The combined electric tower pile foundation comprises a soil layer, wherein a groove I is formed in the upper end of the soil layer, a foundation bottom layer is poured on the bottom end of the groove I, foundation column grooves are built at the four corners of the upper surface of the foundation bottom layer, reinforcing and fixing layers are arranged on the inner walls of the foundation column grooves, concrete is poured between the foundation column grooves and the reinforcing and fixing layers, and foundation columns are arranged in the reinforcing and fixing layers. According to the combined electric tower pile foundation, the foundation bottom layer is poured on the bottom end of the groove I, so that a certain foundation is laid for the building of the whole pile foundation; and the foundation column grooves and the reinforcing and fixing layers are built on the foundation bottom layer, and after the building is finished, concrete is poured in the groove I, so that the electric tower pile foundation is preferably built, the stability of an electric tower is guaranteed, and the condition that the safe use of the electric tower is influenced because concrete cannot achieve the initial fixing effect on soft soil is avoided.
本发明公开了一种联合电塔桩基础,涉及输变电工程设备技术领域,包括土质层,所述土质层的上端开设有一号槽,所述一号槽的底端浇筑有基础底层,所述基础底层上表面的四个拐角处搭建有基柱槽,所述基柱槽的内壁设置有加强固定层,所述基柱槽与加强固定层之间浇筑有混凝土,所述加强固定层的内部设置有基柱。本发明可以通过在一号槽的底端进行浇筑基础底层,为整体的桩基础的搭建奠定了一定的基础,在基础底层上进行搭建基柱槽与加强固定层,且在搭建结束后,并在一号槽的内部浇筑混凝土,很好地进行搭建电塔的桩基础,保证了电塔的稳定性,避免了在较软的土质上混凝土无法达到最初的固定效果,会影响到电塔的安全使用。
Combined electric tower pile foundation
一种联合电塔桩基础
LIU CAIXIU (author)
2021-05-11
Patent
Electronic Resource
Chinese