A platform for research: civil engineering, architecture and urbanism
The invention discloses a totally-closed transparent shed tunnel for a flood discharge atomization area of a power station. The totally-closed transparent shed tunnel is provided with a wall body connected with a mountain slope, a stress framework and a daylighting panel, wherein the stress framework is connected with the wall body to form a totally-closed shed tunnel structure. The conditions of heavy rainfall load, wind load, air pressure characteristics of the atomization area and the like can be prevented; the daylighting panel is fixed through the stress framework, and the cost of additionally applying lighting facilities can be saved while a closed space is formed by adopting the daylighting panel; the difference between light in a shed and external light is small, and a grand scene of flood discharge can be appreciated from the shed; and by adopting a composite fixed connection mode between the stress frameworks, materials can be saved, the construction difficulty can be reduced, and the construction cost can be reduced.
本发明公开了一种电站泄洪雾化区全封闭透明棚洞,设置与山体边坡相连的墙体、受力骨架、采光板,所述受力骨架与所述墙体相连,形成全封闭棚洞结构;能够防止强降雨荷载、风荷载和雾化区气压特征等情况;所述采光板通过所述受力骨架进行固定,采用采光板可以在封闭空间形成的同时,节省额外施加照明设施的成本,且棚内的光线与外部光线的差别小,还能从棚内欣赏泄洪的壮观景象,采用受力骨架间复合式固定连接方式能够节省材料,减轻施工难度,降低工程造价。
The invention discloses a totally-closed transparent shed tunnel for a flood discharge atomization area of a power station. The totally-closed transparent shed tunnel is provided with a wall body connected with a mountain slope, a stress framework and a daylighting panel, wherein the stress framework is connected with the wall body to form a totally-closed shed tunnel structure. The conditions of heavy rainfall load, wind load, air pressure characteristics of the atomization area and the like can be prevented; the daylighting panel is fixed through the stress framework, and the cost of additionally applying lighting facilities can be saved while a closed space is formed by adopting the daylighting panel; the difference between light in a shed and external light is small, and a grand scene of flood discharge can be appreciated from the shed; and by adopting a composite fixed connection mode between the stress frameworks, materials can be saved, the construction difficulty can be reduced, and the construction cost can be reduced.
本发明公开了一种电站泄洪雾化区全封闭透明棚洞,设置与山体边坡相连的墙体、受力骨架、采光板,所述受力骨架与所述墙体相连,形成全封闭棚洞结构;能够防止强降雨荷载、风荷载和雾化区气压特征等情况;所述采光板通过所述受力骨架进行固定,采用采光板可以在封闭空间形成的同时,节省额外施加照明设施的成本,且棚内的光线与外部光线的差别小,还能从棚内欣赏泄洪的壮观景象,采用受力骨架间复合式固定连接方式能够节省材料,减轻施工难度,降低工程造价。
Totally-closed transparent shed tunnel for flood discharge atomization area of power station
一种电站泄洪雾化区全封闭透明棚洞
2021-05-14
Patent
Electronic Resource
Chinese
Flood discharge atomization area ground workshop structure
European Patent Office | 2021
|Construction method of movable totally-closed assembly type wooden shed
European Patent Office | 2022
|Foldable information board suitable for flood discharge atomization area
European Patent Office | 2021
|