Rapid building construction method for container type emergency hospital
The invention discloses a rapid building construction method for a container type emergency hospital. Self-balance of digging and filling in a field in a field leveling stage is realized, the workload is reduced to the greatest extent, a raft foundation and square steel are adopted to form an overhead space, on one hand, a role in preventing moisture is achieved, on the other hand, an operation space is provided for isolation ventilation of a negative pressure ward and comprehensive wiring of water pipes and cables, container type box body modular splicing construction is conducted, all kinds of equipment are debugged, constructed and then debugged, multi-section parallel flow construction is conducted, all professions are constructed in a cross mode, on the premise that the quality is guaranteed, the construction progress is accelerated to the maximum degree, the advanced construction technology of two cloth layers and one film layer is adopted in the foundation construction stage, and environmental protection, safety and reliability are achieved.
本发明公开了一种集装箱类应急医院快速建造施工方法,实现了在场地平整阶段采用场内挖填自平衡,最大限度减少了工作量采用筏板基础+方钢,形成架空空间,一方面起到防潮作用,另一方面为负压病房隔离换气、水管和电缆线综合布线提供作业空间,集装箱式箱体模块化拼接施工,各类设备先调试后施工再调试,并且多区段平行流水施工,各专业穿插施工,在保证质量的前提下,最大程度加快了施工进度;基础施工阶段采用“两布一膜”的先进施工技术,绿色环保,安全可靠。
Rapid building construction method for container type emergency hospital
The invention discloses a rapid building construction method for a container type emergency hospital. Self-balance of digging and filling in a field in a field leveling stage is realized, the workload is reduced to the greatest extent, a raft foundation and square steel are adopted to form an overhead space, on one hand, a role in preventing moisture is achieved, on the other hand, an operation space is provided for isolation ventilation of a negative pressure ward and comprehensive wiring of water pipes and cables, container type box body modular splicing construction is conducted, all kinds of equipment are debugged, constructed and then debugged, multi-section parallel flow construction is conducted, all professions are constructed in a cross mode, on the premise that the quality is guaranteed, the construction progress is accelerated to the maximum degree, the advanced construction technology of two cloth layers and one film layer is adopted in the foundation construction stage, and environmental protection, safety and reliability are achieved.
本发明公开了一种集装箱类应急医院快速建造施工方法,实现了在场地平整阶段采用场内挖填自平衡,最大限度减少了工作量采用筏板基础+方钢,形成架空空间,一方面起到防潮作用,另一方面为负压病房隔离换气、水管和电缆线综合布线提供作业空间,集装箱式箱体模块化拼接施工,各类设备先调试后施工再调试,并且多区段平行流水施工,各专业穿插施工,在保证质量的前提下,最大程度加快了施工进度;基础施工阶段采用“两布一膜”的先进施工技术,绿色环保,安全可靠。
Rapid building construction method for container type emergency hospital
一种集装箱类应急医院快速建造施工方法
LI XIAOPENG (author) / WANG WEIMIN (author) / SUN WEIDONG (author) / SU KAI (author) / WANG YINGBIN (author) / XU JIPING (author) / LIU CHUAN (author) / ZHONG SHAN (author) / CHEN YU (author) / DONG HAIXIA (author)
2021-05-25
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Emergency hospital steel structure integral assembly type module construction method
European Patent Office | 2022
|Rapid Design and Construction Management of Emergency Hospital During the COVID-19 Epidemic
Taylor & Francis Verlag | 2022
|Construction method of hospital building assembly type internal partition wall
European Patent Office | 2023
|