A platform for research: civil engineering, architecture and urbanism
The invention belongs to the technical field of highway bridges and discloses a highway bridge construction platform which comprises a platform assembly, supporting columns are arranged at the bottom of a platform body, and a horizontally-arranged guide frame is fixedly connected to the upper portion of the platform body through a connecting plate; a nail eliminating assembly, wherein V-shaped rods are fixedly connected to the two ends of the roller, and the top ends of the V-shaped rods are movably connected with the shovel frame through rotating shafts; and a nail pulling assembly, wherein a vertical sliding rail is arranged in an inner cavity of the barrel; the roller is driven to move forwards close to the ground along the guide frame, the iron nails erected on the ground are detected and positioned in cooperation with the detection shaft, the sliding block is driven to drive the nail pulling assembly to move to the detection position, then the limiting support is driven to rotate around the circle in cooperation with the swing shaft, and the iron nails are pulled out outwards. The iron nails on the platform are magnetically attracted through the electromagnet arranged in the inner cavity of the roller, the iron nails attracted by the surface of the roller are shoveled off and collected into the shovel frame along with rotation of the roller, subsequent collection of workers is facilitated, and the risk that the workers are punctured by the iron nails is reduced.
本发明公开了公路桥梁技术领域的一种公路桥梁施工平台,包括,平台组件,所述平台本体底部设有支撑柱,且所述平台本体上方通过连接板固定连接有水平设置的导向框;除钉组件,所述滚筒两端固定连接有V型杆,所述V型杆顶端通过转动轴与铲框活动连接;拔钉组件,所述筒体内腔设有竖直的滑轨;本发明驱使滚筒沿着导向框上贴地向前移动,配合检测轴对地面上竖起的铁钉进行检测定位,驱使滑动块带动拔钉组件移动至检测位,再配合摆动轴带动限位支架做绕圈转动,并将铁钉向外拔出,通过其内腔设置的电磁铁对平台上的铁钉进行磁性吸附,随着滚筒的转动,其表面吸起的铁钉被铲落收集至铲框内,便于工作人员后续的收集,降低了工作人员被铁钉扎伤的风险。
The invention belongs to the technical field of highway bridges and discloses a highway bridge construction platform which comprises a platform assembly, supporting columns are arranged at the bottom of a platform body, and a horizontally-arranged guide frame is fixedly connected to the upper portion of the platform body through a connecting plate; a nail eliminating assembly, wherein V-shaped rods are fixedly connected to the two ends of the roller, and the top ends of the V-shaped rods are movably connected with the shovel frame through rotating shafts; and a nail pulling assembly, wherein a vertical sliding rail is arranged in an inner cavity of the barrel; the roller is driven to move forwards close to the ground along the guide frame, the iron nails erected on the ground are detected and positioned in cooperation with the detection shaft, the sliding block is driven to drive the nail pulling assembly to move to the detection position, then the limiting support is driven to rotate around the circle in cooperation with the swing shaft, and the iron nails are pulled out outwards. The iron nails on the platform are magnetically attracted through the electromagnet arranged in the inner cavity of the roller, the iron nails attracted by the surface of the roller are shoveled off and collected into the shovel frame along with rotation of the roller, subsequent collection of workers is facilitated, and the risk that the workers are punctured by the iron nails is reduced.
本发明公开了公路桥梁技术领域的一种公路桥梁施工平台,包括,平台组件,所述平台本体底部设有支撑柱,且所述平台本体上方通过连接板固定连接有水平设置的导向框;除钉组件,所述滚筒两端固定连接有V型杆,所述V型杆顶端通过转动轴与铲框活动连接;拔钉组件,所述筒体内腔设有竖直的滑轨;本发明驱使滚筒沿着导向框上贴地向前移动,配合检测轴对地面上竖起的铁钉进行检测定位,驱使滑动块带动拔钉组件移动至检测位,再配合摆动轴带动限位支架做绕圈转动,并将铁钉向外拔出,通过其内腔设置的电磁铁对平台上的铁钉进行磁性吸附,随着滚筒的转动,其表面吸起的铁钉被铲落收集至铲框内,便于工作人员后续的收集,降低了工作人员被铁钉扎伤的风险。
Highway bridge construction platform
一种公路桥梁施工平台
RAN WEIBIN (author)
2021-05-28
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Modularized mobile construction platform for highway bridge
European Patent Office | 2022
|Detachable operation platform for highway bridge side construction
European Patent Office | 2020
|Detachable operation platform for highway bridge side construction
European Patent Office | 2023
|