Hoisting method suitable for piling mechanical steel sheet pile
The invention provides a hoisting method suitable for a piling mechanical steel sheet pile. A vibration hammer or a chain of other working machines penetrates through a hole in the steel sheet pile to hoist the steel sheet pile, after the steel sheet pile is clamped by a clamp, piling or pile pulling can be directly carried out, the end of the chain is designed to be a hook, operation is convenient, and pile sinking and pile pulling construction of various piling mechanical steel sheet piles can still be independently achieved without cooperation of a crane and many workers. Only one worker is needed for cooperation on a construction site, the labor intensity of the worker is reduced, the construction steps are simplified, the labor time is saved, and therefore the construction work efficiency is greatly improved, and meanwhile the construction cost is reduced.
一种适用于桩工机械钢板桩的吊装方法,利用振动锤或其他工作机的链子穿过钢板桩上的孔将钢板桩吊起,夹具夹住钢板桩后可直接打桩或者拔桩,链条端部为挂钩设计,操作方便,不必配合吊车和较多人工仍可独立实现多种桩工机械钢板桩的沉桩、拔桩施工。施工现场只需一位工人配合,降低了工人的劳动强度,精简了施工步骤,节省了劳动时间,从而大大地提高了施工作业效率,同时也降低了施工成本。
Hoisting method suitable for piling mechanical steel sheet pile
The invention provides a hoisting method suitable for a piling mechanical steel sheet pile. A vibration hammer or a chain of other working machines penetrates through a hole in the steel sheet pile to hoist the steel sheet pile, after the steel sheet pile is clamped by a clamp, piling or pile pulling can be directly carried out, the end of the chain is designed to be a hook, operation is convenient, and pile sinking and pile pulling construction of various piling mechanical steel sheet piles can still be independently achieved without cooperation of a crane and many workers. Only one worker is needed for cooperation on a construction site, the labor intensity of the worker is reduced, the construction steps are simplified, the labor time is saved, and therefore the construction work efficiency is greatly improved, and meanwhile the construction cost is reduced.
一种适用于桩工机械钢板桩的吊装方法,利用振动锤或其他工作机的链子穿过钢板桩上的孔将钢板桩吊起,夹具夹住钢板桩后可直接打桩或者拔桩,链条端部为挂钩设计,操作方便,不必配合吊车和较多人工仍可独立实现多种桩工机械钢板桩的沉桩、拔桩施工。施工现场只需一位工人配合,降低了工人的劳动强度,精简了施工步骤,节省了劳动时间,从而大大地提高了施工作业效率,同时也降低了施工成本。
Hoisting method suitable for piling mechanical steel sheet pile
一种适用于桩工机械钢板桩的吊装方法
WANG ZIFENG (author) / ZHAO BO (author)
2021-06-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|Engineering Index Backfile | 1921
|Engineering Index Backfile | 1909
|Engineering Index Backfile | 1905
Engineering Index Backfile | 1926
|