Anti-cracking process for toilet sewer pipe wall bricks
The invention relates to an anti-cracking process for toilet sewer pipe wall bricks, and relates to the technical field of building construction. The anti-cracking process comprises the following steps that brick laying is conducted, specifically, bricks are piled on a cast-in-place layer to form a brick laying layer; net fixing is conducted, specifically, a steel wire net is fixed to the outer wall surface of the brick laying layer; plastering is conducted, specifically, mortar is smeared on the brick laying layer to form a plastering layer; and leveling is conducted, specifically, cement mortar is smeared on the plastering layer to form a leveling layer; and surface layer is conducted, specifically, the wall bricks are laid on the leveling layer through an adhesive to form a surface layer, and pointing and seam wiping treatment is conducted on the wall bricks, wherein the steel wire net is fixed to the brick laying layer through heat preservation nails, mortar is smeared on the plastering layer twice, the time interval of two times of mortar smearing is one day, and the first plastering layer completely covers the steel wire net. According to the anti-cracking process, the steel wire net is fixed to the outer wall surface, plastering treatment is conducted, the overall strength of a wall body is ensured, and anti-cracking of the toilet sewer pipe wall bricks is effectively avoided.
本申请涉及一种卫生间下水管墙砖抗裂工艺,涉及建筑施工的技术领域,其包括以下步骤,砌砖:在现浇层上堆砌砖块形成砖砌层;固网:在砖砌层的外墙面上固定钢丝网;粉刷:在砖砌层上涂抹灰浆形成抹灰层;找平:在抹灰层上涂抹水泥砂浆形成找平层;面层:在找平层上通过粘接剂铺设墙砖形成面层,并对墙砖进行勾缝和擦缝处理;其中,通过保温钉将钢丝网固定在砖砌层上;抹灰层进行两次涂抹灰浆,两次涂抹灰浆的时间间隔为一天,第一层抹灰层完全覆盖住钢丝网。本申请在外墙面上固定钢丝网并进行粉刷处理,保证了墙体的整体强度,有效避免了卫生间下水管墙砖的抗裂。
Anti-cracking process for toilet sewer pipe wall bricks
The invention relates to an anti-cracking process for toilet sewer pipe wall bricks, and relates to the technical field of building construction. The anti-cracking process comprises the following steps that brick laying is conducted, specifically, bricks are piled on a cast-in-place layer to form a brick laying layer; net fixing is conducted, specifically, a steel wire net is fixed to the outer wall surface of the brick laying layer; plastering is conducted, specifically, mortar is smeared on the brick laying layer to form a plastering layer; and leveling is conducted, specifically, cement mortar is smeared on the plastering layer to form a leveling layer; and surface layer is conducted, specifically, the wall bricks are laid on the leveling layer through an adhesive to form a surface layer, and pointing and seam wiping treatment is conducted on the wall bricks, wherein the steel wire net is fixed to the brick laying layer through heat preservation nails, mortar is smeared on the plastering layer twice, the time interval of two times of mortar smearing is one day, and the first plastering layer completely covers the steel wire net. According to the anti-cracking process, the steel wire net is fixed to the outer wall surface, plastering treatment is conducted, the overall strength of a wall body is ensured, and anti-cracking of the toilet sewer pipe wall bricks is effectively avoided.
本申请涉及一种卫生间下水管墙砖抗裂工艺,涉及建筑施工的技术领域,其包括以下步骤,砌砖:在现浇层上堆砌砖块形成砖砌层;固网:在砖砌层的外墙面上固定钢丝网;粉刷:在砖砌层上涂抹灰浆形成抹灰层;找平:在抹灰层上涂抹水泥砂浆形成找平层;面层:在找平层上通过粘接剂铺设墙砖形成面层,并对墙砖进行勾缝和擦缝处理;其中,通过保温钉将钢丝网固定在砖砌层上;抹灰层进行两次涂抹灰浆,两次涂抹灰浆的时间间隔为一天,第一层抹灰层完全覆盖住钢丝网。本申请在外墙面上固定钢丝网并进行粉刷处理,保证了墙体的整体强度,有效避免了卫生间下水管墙砖的抗裂。
Anti-cracking process for toilet sewer pipe wall bricks
一种卫生间下水管墙砖抗裂工艺
LI DONGLIANG (author)
2021-06-04
Patent
Electronic Resource
Chinese