Construction method of anti-seepage brick inspection well
The invention discloses a construction method of an anti-seepage brick inspection well. The construction method comprises the following steps that S1, foundation construction of the inspection well is conducted, specifically, a foundation pit is dug, and a cushion layer, a leveling layer and a well foundation layer are filled; S2, the inspection well is built, specifically, the inspection well is built through staggered joints of bricks on the upper layer and the lower layer, a pipeline hole is reserved, and a well lid cover plate is mounted when the strength of masonry mortar reaches 70-80% of a preset value; S3, a pipeline is connected into the reserved pipeline hole; and S4, the inner wall of a well chamber is coated with waterproof paint. According to the construction method of the anti-seepage brick inspection well, seepage is effectively prevented, and the qualification rate of a closed water test is increased.
本发明公开一种防渗漏砖砌检查井的施工方法,包括以下步骤:S1、检查井基础施工:挖基坑,填充垫层、找平层和井基础层;S2、砌筑检查井:上下层砖块错缝砌筑检查井,并预留管道孔洞,待砌筑砂浆强度达到预设值的70‑80%时安装上井盖盖板;S3、将管道接入预留的管道孔洞;S4、在井室内壁涂刷防水涂料;本发明提供了一种有效防止渗漏、增加闭水试验合格率的防渗漏砖砌检查井的施工方法。
Construction method of anti-seepage brick inspection well
The invention discloses a construction method of an anti-seepage brick inspection well. The construction method comprises the following steps that S1, foundation construction of the inspection well is conducted, specifically, a foundation pit is dug, and a cushion layer, a leveling layer and a well foundation layer are filled; S2, the inspection well is built, specifically, the inspection well is built through staggered joints of bricks on the upper layer and the lower layer, a pipeline hole is reserved, and a well lid cover plate is mounted when the strength of masonry mortar reaches 70-80% of a preset value; S3, a pipeline is connected into the reserved pipeline hole; and S4, the inner wall of a well chamber is coated with waterproof paint. According to the construction method of the anti-seepage brick inspection well, seepage is effectively prevented, and the qualification rate of a closed water test is increased.
本发明公开一种防渗漏砖砌检查井的施工方法,包括以下步骤:S1、检查井基础施工:挖基坑,填充垫层、找平层和井基础层;S2、砌筑检查井:上下层砖块错缝砌筑检查井,并预留管道孔洞,待砌筑砂浆强度达到预设值的70‑80%时安装上井盖盖板;S3、将管道接入预留的管道孔洞;S4、在井室内壁涂刷防水涂料;本发明提供了一种有效防止渗漏、增加闭水试验合格率的防渗漏砖砌检查井的施工方法。
Construction method of anti-seepage brick inspection well
一种防渗漏砖砌检查井的施工方法
ZHANG BO (author) / ZOU BIN (author) / HUANG SHUAI (author)
2021-06-11
Patent
Electronic Resource
Chinese
Concrete module type drainage inspection well anti-seepage construction method
European Patent Office | 2022
|T-shaped brick moulding bed anti-seepage device and construction method
European Patent Office | 2021
|European Patent Office | 2022
|Anti-seepage structure of drainage inspection well and application method of anti-seepage structure
European Patent Office | 2023
|