A platform for research: civil engineering, architecture and urbanism
Prefabricated reinforced concrete fully-fabricated roof cornice and construction method thereof
The invention relates to a prefabricated reinforced concrete fully-fabricated roof cornice. The prefabricated reinforced concrete fully-fabricated roof cornice comprises prefabricated concrete members, a prefabricated main beam, a prefabricated overhanging main beam, a prefabricated secondary beam, a prefabricated sealing beam and a prefabricated overhanging cantilever sealing beam, wherein the two ends of the prefabricated main beam are supported on concrete vertical components, the prefabricated overhanging main beam is erected on the concrete vertical components, the prefabricated overhanging main beam extends out of a fabricated roof, the prefabricated main beam is connected to the prefabricated overhanging main beam, the prefabricated secondary beam is erected on the concrete vertical components, the two ends of the prefabricated secondary beam are connected to a prefabricated cantilever main beam correspondingly, the two ends of the prefabricated sealing beam and the two ends of the prefabricated overhanging cantilever sealing beam are connected to the prefabricated cantilever main beam extending out of the fabricated roof correspondingly, wherein embedded parts are arranged on the concrete vertical components, and the concrete vertical components, the prefabricated main beam, the prefabricated cantilever main beam, the prefabricated secondary beam, the prefabricated sealing beam and the prefabricated overhanging cantilever sealing beam are connected through embedded parts. According to the technical solution of the prefabricated reinforced concrete fully-fabricated roof cornice and the construction method thereof, a construction supporting platform does not need to be erected, form boards and formworks do not need to be laid, steel bar binding and concrete pouring are not needed, and the concrete curing time is saved.
本申请涉及一种预制钢筋混凝土全装配式屋面挑檐,包括预制混凝土构件;预制主梁,其两端支撑于混凝土竖向构件上;预制悬挑主梁,架设于混凝土竖向构件上,预制悬挑主梁伸出全装配式屋面,预制主梁与预制悬挑主梁相连接;预制次梁,架设于混凝土竖向构件上,预制次梁的两端分别与预制悬挑主梁相连接;预制封口梁及预制悬挑封口梁,其两端分别与伸出全装配式屋面的预制悬挑主梁相连接;其中,混凝土竖向构件上设有预埋件,混凝土竖向构件、预制主梁、预制悬挑主梁、预制次梁、预制封口梁和预制悬挑封口梁通过预埋件相连接。在本申请的技术方案中,不用搭设施工支撑平台,不需铺设模板和支模、免钢筋绑扎、免浇筑混凝土、省去了混凝土养护时间。
Prefabricated reinforced concrete fully-fabricated roof cornice and construction method thereof
The invention relates to a prefabricated reinforced concrete fully-fabricated roof cornice. The prefabricated reinforced concrete fully-fabricated roof cornice comprises prefabricated concrete members, a prefabricated main beam, a prefabricated overhanging main beam, a prefabricated secondary beam, a prefabricated sealing beam and a prefabricated overhanging cantilever sealing beam, wherein the two ends of the prefabricated main beam are supported on concrete vertical components, the prefabricated overhanging main beam is erected on the concrete vertical components, the prefabricated overhanging main beam extends out of a fabricated roof, the prefabricated main beam is connected to the prefabricated overhanging main beam, the prefabricated secondary beam is erected on the concrete vertical components, the two ends of the prefabricated secondary beam are connected to a prefabricated cantilever main beam correspondingly, the two ends of the prefabricated sealing beam and the two ends of the prefabricated overhanging cantilever sealing beam are connected to the prefabricated cantilever main beam extending out of the fabricated roof correspondingly, wherein embedded parts are arranged on the concrete vertical components, and the concrete vertical components, the prefabricated main beam, the prefabricated cantilever main beam, the prefabricated secondary beam, the prefabricated sealing beam and the prefabricated overhanging cantilever sealing beam are connected through embedded parts. According to the technical solution of the prefabricated reinforced concrete fully-fabricated roof cornice and the construction method thereof, a construction supporting platform does not need to be erected, form boards and formworks do not need to be laid, steel bar binding and concrete pouring are not needed, and the concrete curing time is saved.
本申请涉及一种预制钢筋混凝土全装配式屋面挑檐,包括预制混凝土构件;预制主梁,其两端支撑于混凝土竖向构件上;预制悬挑主梁,架设于混凝土竖向构件上,预制悬挑主梁伸出全装配式屋面,预制主梁与预制悬挑主梁相连接;预制次梁,架设于混凝土竖向构件上,预制次梁的两端分别与预制悬挑主梁相连接;预制封口梁及预制悬挑封口梁,其两端分别与伸出全装配式屋面的预制悬挑主梁相连接;其中,混凝土竖向构件上设有预埋件,混凝土竖向构件、预制主梁、预制悬挑主梁、预制次梁、预制封口梁和预制悬挑封口梁通过预埋件相连接。在本申请的技术方案中,不用搭设施工支撑平台,不需铺设模板和支模、免钢筋绑扎、免浇筑混凝土、省去了混凝土养护时间。
Prefabricated reinforced concrete fully-fabricated roof cornice and construction method thereof
一种预制钢筋混凝土全装配式屋面挑檐及其施工方法
ZHANG SHUCHUAN (author) / YE ZHIJIAN (author) / LIN LONGFU (author) / XU TIANJIN (author) / YE SHUNBIN (author)
2021-06-11
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Fabricated cornice sloping roof and installation and construction method thereof
European Patent Office | 2022
|Fully-fabricated reinforced concrete structure roof and construction method thereof
European Patent Office | 2023
|Fabricated roof cornice fixing joint and mounting method
European Patent Office | 2021
|