Construction hoist foundation and construction method of construction hoist
The invention relates to a construction hoist foundation and a construction method of a construction hoist. A construction method of the construction hoist foundation includes the following steps that the outer edge line of a standard layer structure is positioned; according to the outer edge line, a retaining wall is constructed on a basement top plate; the elevation of the retaining wall is equal to the elevation of a first-layer structure; and the construction hoist foundation is formed on the retaining wall. According to the construction method of the construction hoist foundation and the construction method of the construction hoist, through the arrangement of the retaining wall, the construction hoist foundation is constructed on the retaining wall according to the outer side line of the standard layer structure and the outer side line of the first-layer structure, so that potential safety hazards caused by the fact that the distance between the outer side line of the standard layer structure and the outer side line of the first-layer structure is too large are avoided, potential safety hazards are reduced, and safety protection cost can be reduced.
本发明涉及一种施工升降机基础及施工升降机的施工方法。该施工升降机基础的施工方法,包括以下步骤:定位标准层结构的外边线;根据所述外边线,在地下室顶板上施工挡土墙;所述挡土墙的标高与首层结构的标高相等;在所述挡土墙上形成施工升降机基础。上述施工升降机基础的施工方法以及施工升降机的施工方法,通过挡土墙的设置,根据标准层结构的外边线和首层结构的外边线,在挡土墙上施工施工升降机基础,从而避免标准层结构的外边线和首层结构的外边线之间的距离过大而引起的安全隐患,减少安全隐患,且能够降低安全防护成本。
Construction hoist foundation and construction method of construction hoist
The invention relates to a construction hoist foundation and a construction method of a construction hoist. A construction method of the construction hoist foundation includes the following steps that the outer edge line of a standard layer structure is positioned; according to the outer edge line, a retaining wall is constructed on a basement top plate; the elevation of the retaining wall is equal to the elevation of a first-layer structure; and the construction hoist foundation is formed on the retaining wall. According to the construction method of the construction hoist foundation and the construction method of the construction hoist, through the arrangement of the retaining wall, the construction hoist foundation is constructed on the retaining wall according to the outer side line of the standard layer structure and the outer side line of the first-layer structure, so that potential safety hazards caused by the fact that the distance between the outer side line of the standard layer structure and the outer side line of the first-layer structure is too large are avoided, potential safety hazards are reduced, and safety protection cost can be reduced.
本发明涉及一种施工升降机基础及施工升降机的施工方法。该施工升降机基础的施工方法,包括以下步骤:定位标准层结构的外边线;根据所述外边线,在地下室顶板上施工挡土墙;所述挡土墙的标高与首层结构的标高相等;在所述挡土墙上形成施工升降机基础。上述施工升降机基础的施工方法以及施工升降机的施工方法,通过挡土墙的设置,根据标准层结构的外边线和首层结构的外边线,在挡土墙上施工施工升降机基础,从而避免标准层结构的外边线和首层结构的外边线之间的距离过大而引起的安全隐患,减少安全隐患,且能够降低安全防护成本。
Construction hoist foundation and construction method of construction hoist
施工升降机基础及施工升降机的施工方法
YANG ZHAOTING (author) / ZHAO SHENG (author) / WANG MINGWEI (author) / ZOU MENGGEN (author) / LIU JUN (author) / PENG JINHUA (author)
2021-06-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Basement roof construction hoist foundation construction method
European Patent Office | 2023
|Construction hoist foundation support back-jacking construction method
European Patent Office | 2024
|