A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of concrete formworks, in particular to a concrete formwork pouring structure and a using method thereof. The concrete formwork pouring structure comprises a pouring table, first partition plates are arranged at the left side and the right end of the top end of the pouring table, first fixing blocks are fixedly connected to the front ends and the rear ends of the two first partition plates at the top ends of the two first partition plates, second fixing blocks are fixedly connected to the four corners of the top end of the pouring table correspondingly, first electric cylinders are fixedly connected to the ends, close to the center face of the pouring table, of the four second fixing blocks correspondingly, the ends, away from the second fixing blocks, of the four first electric cylinders are fixedly connected with the ends, away from the center face of the pouring table, of four first fixing blocks correspondingly, first convex grooves are formed in the left side and the right side of the top end of the pouring table correspondingly, and the interior of each first convex groove is rotationally connected with a two-way screw rod. The length and width of a formwork can be conveniently adjusted, the formwork can be conveniently taken out, the working intensity of people is reduced, the working efficiency is improved, and the using limitation of the formwork is reduced.
本发明涉及混凝土模板技术领域,具体为一种混凝土模板浇筑结构及其使用方法,包括浇筑台,浇筑台的顶端的左侧和右端均设置有第一隔板,两个第一隔板的顶端两个第一隔板的前端和后端均固定连接有第一固定块,浇筑台的顶端的四角的位置均固定连接有第二固定块,四个第二固定块靠近浇筑台中心面的一端均固定连接有第一电动缸,四个第一电动缸远离第二固定块的一端分别与四个第一固定块远离浇筑台中心面的一端固定连接,浇筑台的顶端的左侧和右侧均设置有第一凸型槽,各第一凸型槽的内部均转动连接有双向螺杆;其便于对模板的长度和宽度进行调节,便于将模板取出,降低了人们的工作强度,提高了工作的效率,降低了其使用的局限性。
The invention relates to the technical field of concrete formworks, in particular to a concrete formwork pouring structure and a using method thereof. The concrete formwork pouring structure comprises a pouring table, first partition plates are arranged at the left side and the right end of the top end of the pouring table, first fixing blocks are fixedly connected to the front ends and the rear ends of the two first partition plates at the top ends of the two first partition plates, second fixing blocks are fixedly connected to the four corners of the top end of the pouring table correspondingly, first electric cylinders are fixedly connected to the ends, close to the center face of the pouring table, of the four second fixing blocks correspondingly, the ends, away from the second fixing blocks, of the four first electric cylinders are fixedly connected with the ends, away from the center face of the pouring table, of four first fixing blocks correspondingly, first convex grooves are formed in the left side and the right side of the top end of the pouring table correspondingly, and the interior of each first convex groove is rotationally connected with a two-way screw rod. The length and width of a formwork can be conveniently adjusted, the formwork can be conveniently taken out, the working intensity of people is reduced, the working efficiency is improved, and the using limitation of the formwork is reduced.
本发明涉及混凝土模板技术领域,具体为一种混凝土模板浇筑结构及其使用方法,包括浇筑台,浇筑台的顶端的左侧和右端均设置有第一隔板,两个第一隔板的顶端两个第一隔板的前端和后端均固定连接有第一固定块,浇筑台的顶端的四角的位置均固定连接有第二固定块,四个第二固定块靠近浇筑台中心面的一端均固定连接有第一电动缸,四个第一电动缸远离第二固定块的一端分别与四个第一固定块远离浇筑台中心面的一端固定连接,浇筑台的顶端的左侧和右侧均设置有第一凸型槽,各第一凸型槽的内部均转动连接有双向螺杆;其便于对模板的长度和宽度进行调节,便于将模板取出,降低了人们的工作强度,提高了工作的效率,降低了其使用的局限性。
Formwork structure for concrete pouring and concrete pouring method
European Patent Office | 2021
|Formwork for concrete pouring and pouring method thereof
European Patent Office | 2022
|