A platform for research: civil engineering, architecture and urbanism
The invention relates to a buffering pressure regulating chamber structure for a hydropower station, and solves the problems that in the prior art, weakening of water hammer pressure is limited, and the construction cost is high. According to the technical scheme for solving the problems, the buffering pressure regulating chamber structure comprises a pressure pipeline, a pressure regulating chamber is arranged on the pressure pipeline, a protruding part is arranged at the bottom of the pressure regulating chamber and is a cavity communicating with the pressure regulating chamber, a first connecting pipe for communicating the pressure regulating chamber with the pressure pipeline is installed between the pressure regulating chamber and the pressure pipeline, a second connecting pipe for communicating the pressure regulating chamber with the pressure pipeline is installed between the pressure pipeline and the protruding part, the first connecting pipe and the second connecting pipe are each provided with a buffering device, a third connecting pipe for connecting the first connecting pipe with a cavity body of the protruding part is installed between the first connecting pipe and the protruding part, and supporting devices are installed between the pressure pipeline and the pressure regulating chamber and between the pressure pipeline and the protruding part. The buffering pressure regulating chamber structure for the hydropower station is novel in conception, ingenious in structure and high in practicability.
本发明涉及一种水电站用缓冲调压室结构,解决现有技术中对水击压力的削弱有限,工程造价较高的问题;其解决的技术方案是:包括一个压力管道,压力管道上设置有一个调压室,所述的调压室的底部的有一个突出部,突出部为与调压室相通的腔室,所述的调压室与压力管道之间安装有一个将调压室与压力管道相连通的第一连接管,压力管道与突出部之间安装有一个将调压室与压力管道相连通的第二连接管,所述的第一连接管和第二连接管上均安装有一个缓冲装置,所述的第一连接管与突出部之间安装有一个将第一连接管与突出部腔体相连的第三连接管,所述的压力管道与调压室之间、压力管道与突出部之间均安装有支撑装置;本发明构思新颖,结构巧妙,实用性强。
The invention relates to a buffering pressure regulating chamber structure for a hydropower station, and solves the problems that in the prior art, weakening of water hammer pressure is limited, and the construction cost is high. According to the technical scheme for solving the problems, the buffering pressure regulating chamber structure comprises a pressure pipeline, a pressure regulating chamber is arranged on the pressure pipeline, a protruding part is arranged at the bottom of the pressure regulating chamber and is a cavity communicating with the pressure regulating chamber, a first connecting pipe for communicating the pressure regulating chamber with the pressure pipeline is installed between the pressure regulating chamber and the pressure pipeline, a second connecting pipe for communicating the pressure regulating chamber with the pressure pipeline is installed between the pressure pipeline and the protruding part, the first connecting pipe and the second connecting pipe are each provided with a buffering device, a third connecting pipe for connecting the first connecting pipe with a cavity body of the protruding part is installed between the first connecting pipe and the protruding part, and supporting devices are installed between the pressure pipeline and the pressure regulating chamber and between the pressure pipeline and the protruding part. The buffering pressure regulating chamber structure for the hydropower station is novel in conception, ingenious in structure and high in practicability.
本发明涉及一种水电站用缓冲调压室结构,解决现有技术中对水击压力的削弱有限,工程造价较高的问题;其解决的技术方案是:包括一个压力管道,压力管道上设置有一个调压室,所述的调压室的底部的有一个突出部,突出部为与调压室相通的腔室,所述的调压室与压力管道之间安装有一个将调压室与压力管道相连通的第一连接管,压力管道与突出部之间安装有一个将调压室与压力管道相连通的第二连接管,所述的第一连接管和第二连接管上均安装有一个缓冲装置,所述的第一连接管与突出部之间安装有一个将第一连接管与突出部腔体相连的第三连接管,所述的压力管道与调压室之间、压力管道与突出部之间均安装有支撑装置;本发明构思新颖,结构巧妙,实用性强。
Buffering pressure regulating chamber structure for hydropower station
一种水电站用缓冲调压室结构
JIA TAO (author)
2021-06-18
Patent
Electronic Resource
Chinese
Hydropower station sediment silt buffering and intercepting device and implementation method
European Patent Office | 2021
|Hydropower station runner chamber concrete high-pressure water jet dismantling construction method
European Patent Office | 2023
|Hydropower station gate chamber management device and method
European Patent Office | 2024
|Hydropower station ship lift chamber convenient to transport
European Patent Office | 2022
|Hydropower station runner chamber dismantling system and operation method thereof
European Patent Office | 2023
|