A platform for research: civil engineering, architecture and urbanism
Fabricated tailing pond radiation well walling crib with fixing grooves and construction technology
The invention discloses a fabricated tailing pond radiation well walling crib with fixing grooves and a construction technology. The walling crib comprises a plurality of arc-shaped prefabricated well walls, and the prefabricated well walls are spliced to form annular walling crib bodies. The walling crib bodies are spliced up and down to form a fabricated radiation well. The fixing grooves are integrally formed in the ends of the prefabricated well walls, fixing blocks are integrally formed at the other ends of the prefabricated well walls, and the fixing grooves and the fixing blocks between the left and right adjacent prefabricated well walls are mutually spliced to form the annular walling crib bodies. Preformed holes are formed in the prefabricated well walls in the longitudinal direction, fixing rods are arranged in the preformed holes, the bottoms of the fixing rods are arranged in the preformed holes of the prefabricated well wall on the lower portion of the upper prefabricated well wall and the lower prefabricated well wall, and the tops of the fixing rods are arranged in the preformed holes of the prefabricated well wall on the upper portion of the upper prefabricated well wall and the lower prefabricated well wall. The walling crib bodies are formed through left-right splicing, the upper walling crib and the lower walling crib are spliced to form the radiation well, installation is easy, construction is convenient, the installation efficiency can be improved, and construction risks are reduced.
本发明公开了一种带固定槽的装配式尾矿库辐射井井圈及施工工艺,包括若干块弧状的预制井壁,所述预制井壁拼接后成型环装的井圈;所述井圈上下拼接形成装配式辐射井;所述预制井壁一端一体成型有固定槽,所述预制井壁另一端一体成型有固定块,左右相邻所述预制井壁之间的固定槽和固定块相互拼接形成环装井圈;所述预制井壁的纵向开设有预留孔,所述预留孔内设置有固定杆,所述固定杆底部设置在上下两个预制井壁的下部的预制井壁的预留孔中,所述固定杆顶部设置在上下两个预制井壁的上部的预制井壁的预留孔中;本发明采用先左右拼接形成井圈,上下井圈拼接形成辐射井,安装简单、施工方便,可以提高安装效率,减少施工风险。
Fabricated tailing pond radiation well walling crib with fixing grooves and construction technology
The invention discloses a fabricated tailing pond radiation well walling crib with fixing grooves and a construction technology. The walling crib comprises a plurality of arc-shaped prefabricated well walls, and the prefabricated well walls are spliced to form annular walling crib bodies. The walling crib bodies are spliced up and down to form a fabricated radiation well. The fixing grooves are integrally formed in the ends of the prefabricated well walls, fixing blocks are integrally formed at the other ends of the prefabricated well walls, and the fixing grooves and the fixing blocks between the left and right adjacent prefabricated well walls are mutually spliced to form the annular walling crib bodies. Preformed holes are formed in the prefabricated well walls in the longitudinal direction, fixing rods are arranged in the preformed holes, the bottoms of the fixing rods are arranged in the preformed holes of the prefabricated well wall on the lower portion of the upper prefabricated well wall and the lower prefabricated well wall, and the tops of the fixing rods are arranged in the preformed holes of the prefabricated well wall on the upper portion of the upper prefabricated well wall and the lower prefabricated well wall. The walling crib bodies are formed through left-right splicing, the upper walling crib and the lower walling crib are spliced to form the radiation well, installation is easy, construction is convenient, the installation efficiency can be improved, and construction risks are reduced.
本发明公开了一种带固定槽的装配式尾矿库辐射井井圈及施工工艺,包括若干块弧状的预制井壁,所述预制井壁拼接后成型环装的井圈;所述井圈上下拼接形成装配式辐射井;所述预制井壁一端一体成型有固定槽,所述预制井壁另一端一体成型有固定块,左右相邻所述预制井壁之间的固定槽和固定块相互拼接形成环装井圈;所述预制井壁的纵向开设有预留孔,所述预留孔内设置有固定杆,所述固定杆底部设置在上下两个预制井壁的下部的预制井壁的预留孔中,所述固定杆顶部设置在上下两个预制井壁的上部的预制井壁的预留孔中;本发明采用先左右拼接形成井圈,上下井圈拼接形成辐射井,安装简单、施工方便,可以提高安装效率,减少施工风险。
Fabricated tailing pond radiation well walling crib with fixing grooves and construction technology
一种带固定槽的装配式尾矿库辐射井井圈及施工工艺
LI SHIWEN (author) / ZHANG YUE'AN (author) / DENG JINYUAN (author) / ZHANG HAN (author) / ZHANG ZHIHUA (author)
2021-06-18
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Walling crib replacing device for road administration construction
European Patent Office | 2021
|Mold for anti-settling well lid construction limiting walling crib and construction method thereof
European Patent Office | 2020
|