A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of supporting devices, and discloses a foundation pit opening steel structure supporting device used after building foundation pit excavation. The foundation pit opening steel structure supporting device comprises a machine shell; a cooling device is fixedly connected in the machine shell; a hot air pipe is fixedly connected to the left side of the cooling device; a first notch is formed in the left side of the hot air pipe; a first long rod is rotationally connected to the bottom of the cooling device; a second notch is formed in the first long rod; and a leakage opening is formed in the bottom of the first long rod. According to the foundation pit opening steel structure supporting device used after building foundation pit excavation, water slides leftwards along the surface of the first long rod, the first long rod is made to rotate and extrude a first supporting rod, air in a reaction device drives a second supporting rod to move upwards, water slides to the rightmost side through a third notch to react with quick lime, meanwhile, a sliding rod in the reaction device pushes the quick lime to the rightmost side, hot air dries wet soil through the hot air pipe, and therefore the waterproof effect is achieved.
本发明涉及支护装置技术领域,且公开了一种建筑基坑挖设后的基坑口钢结构支护装置,包括机壳,所述机壳内部固定连接有冷却装置,所述冷却装置左侧固定连接有热气管,所述热气管左侧开设有第一槽口,所述冷却装置底部转动连接有第一长杆,所述第一长杆内部开设有第二槽口,所述第一长杆底部设置有漏口。该建筑基坑挖设后的基坑口钢结构支护装置,水沿着第一长杆表面向左滑动,使第一长杆转动并且挤压第一支撑杆使反应装置内的空气带动第二支撑杆向上移动,使水通过第三槽口滑向最右侧与生石灰反应,同时反应装置内的滑杆推动生石灰到最右侧,热气通过热气管对湿润的泥土进行烘干,从而达到了防水的效果。
The invention relates to the technical field of supporting devices, and discloses a foundation pit opening steel structure supporting device used after building foundation pit excavation. The foundation pit opening steel structure supporting device comprises a machine shell; a cooling device is fixedly connected in the machine shell; a hot air pipe is fixedly connected to the left side of the cooling device; a first notch is formed in the left side of the hot air pipe; a first long rod is rotationally connected to the bottom of the cooling device; a second notch is formed in the first long rod; and a leakage opening is formed in the bottom of the first long rod. According to the foundation pit opening steel structure supporting device used after building foundation pit excavation, water slides leftwards along the surface of the first long rod, the first long rod is made to rotate and extrude a first supporting rod, air in a reaction device drives a second supporting rod to move upwards, water slides to the rightmost side through a third notch to react with quick lime, meanwhile, a sliding rod in the reaction device pushes the quick lime to the rightmost side, hot air dries wet soil through the hot air pipe, and therefore the waterproof effect is achieved.
本发明涉及支护装置技术领域,且公开了一种建筑基坑挖设后的基坑口钢结构支护装置,包括机壳,所述机壳内部固定连接有冷却装置,所述冷却装置左侧固定连接有热气管,所述热气管左侧开设有第一槽口,所述冷却装置底部转动连接有第一长杆,所述第一长杆内部开设有第二槽口,所述第一长杆底部设置有漏口。该建筑基坑挖设后的基坑口钢结构支护装置,水沿着第一长杆表面向左滑动,使第一长杆转动并且挤压第一支撑杆使反应装置内的空气带动第二支撑杆向上移动,使水通过第三槽口滑向最右侧与生石灰反应,同时反应装置内的滑杆推动生石灰到最右侧,热气通过热气管对湿润的泥土进行烘干,从而达到了防水的效果。
Foundation pit opening steel structure supporting device used after building foundation pit excavation
一种建筑基坑挖设后的基坑口钢结构支护装置
CHAI LI (author)
2021-06-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation pit opening steel structure supporting device after excavation of building foundation pit
European Patent Office | 2021
|Foundation excavation supporting plate structure for building construction
European Patent Office | 2024
|Foundation pit supporting structure for foundation pit excavation
European Patent Office | 2021
|Foundation pit supporting structure for foundation pit excavation
European Patent Office | 2024
|