Method for replacing sleepers of railway line
The invention discloses a method for replacing sleepers of a railway line, which sequentially comprises the following steps of: raking ballast, dismantling old sleepers, replacing new sleepers and backfilling and arranging a ballast bed. A sleeper lifting device is used in the process of replacing the new sleepers, and spikes matched with pre-embedded track holes in the sleepers are arranged on the lifting mechanism. The new sleeper changing-in process comprises the steps that (a1), the new sleeper is moved to the designated position; (a2) adjacent fastener nodes are measured, and the position of a new sleeper is determined and marked; (a3) a clamping mechanism is clamped at the marked position; (a4) track nails are installed in the pre-buried track holes, located in the inner side of a track, of the new sleeper, and the new sleeper is lifted till the new sleeper is closely attached to the steel rails; (a5) fasteners on the outer sides of the two steel rails are installed; (a6) the sleeper lifting device is disassembled; and (a7) fasteners on the inner sides of the two steel rails are installed. Through the method, the replacement efficiency of sleepers is increased and labor intensity is reduced.
本发明公开了一种铁路线路更换轨枕的方法,该方法顺次包括:扒道碴、拆除旧轨枕、换入新轨枕和回填整理道床,在换入新轨枕过程中使用一种轨枕提升装置,提升机构上设置有与轨枕上的预埋道孔相匹配的道钉;新轨枕换入过程为:a1)移入新轨枕至指定位置;a2)对相邻扣件节点进行测量,确定新轨枕的位置并标记;a3)将卡合机构卡合在标记位置;a4)将道钉装入新轨枕上位于轨道内侧的预埋道孔内并提升新轨枕,直到新轨枕与钢轨密切贴合;a5)对两根钢轨外侧扣件进行安装;a6)拆除轨枕提升装置;a7)对两钢轨内侧扣件进行安装。该方法能够加快轨枕的更换效率,减小劳动强度。
Method for replacing sleepers of railway line
The invention discloses a method for replacing sleepers of a railway line, which sequentially comprises the following steps of: raking ballast, dismantling old sleepers, replacing new sleepers and backfilling and arranging a ballast bed. A sleeper lifting device is used in the process of replacing the new sleepers, and spikes matched with pre-embedded track holes in the sleepers are arranged on the lifting mechanism. The new sleeper changing-in process comprises the steps that (a1), the new sleeper is moved to the designated position; (a2) adjacent fastener nodes are measured, and the position of a new sleeper is determined and marked; (a3) a clamping mechanism is clamped at the marked position; (a4) track nails are installed in the pre-buried track holes, located in the inner side of a track, of the new sleeper, and the new sleeper is lifted till the new sleeper is closely attached to the steel rails; (a5) fasteners on the outer sides of the two steel rails are installed; (a6) the sleeper lifting device is disassembled; and (a7) fasteners on the inner sides of the two steel rails are installed. Through the method, the replacement efficiency of sleepers is increased and labor intensity is reduced.
本发明公开了一种铁路线路更换轨枕的方法,该方法顺次包括:扒道碴、拆除旧轨枕、换入新轨枕和回填整理道床,在换入新轨枕过程中使用一种轨枕提升装置,提升机构上设置有与轨枕上的预埋道孔相匹配的道钉;新轨枕换入过程为:a1)移入新轨枕至指定位置;a2)对相邻扣件节点进行测量,确定新轨枕的位置并标记;a3)将卡合机构卡合在标记位置;a4)将道钉装入新轨枕上位于轨道内侧的预埋道孔内并提升新轨枕,直到新轨枕与钢轨密切贴合;a5)对两根钢轨外侧扣件进行安装;a6)拆除轨枕提升装置;a7)对两钢轨内侧扣件进行安装。该方法能够加快轨枕的更换效率,减小劳动强度。
Method for replacing sleepers of railway line
一种铁路线路更换轨枕的方法
XIAO JUNHENG (author) / YU HAOYONG (author) / LIU CHANGXI (author) / LI ZIRUI (author) / ZHANG HUAN (author) / CHEN CHEN (author) / WEI YONGWANG (author) / WANG SHUYI (author) / LI ZHIWEI (author) / ZHU JIGUANG (author)
2021-06-25
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Equipment for replacing railway sleepers in permafrost region
European Patent Office | 2021
|METHOD AND TRACK-LAYING MACHINE FOR REPLACING SLEEPERS OF RAILWAY, FORMED FROM RAILS AND SLEEPERS
European Patent Office | 2018
|Engineering Index Backfile | 1963
Online Contents | 1996