A platform for research: civil engineering, architecture and urbanism
Prefabricated comprehensive pipe gallery stable in splicing
The invention relates to a prefabricated comprehensive pipe gallery stable in splicing, and relates to the field of urban underground buildings. The prefabricated comprehensive pipe gallery comprises a pipe gallery body; the pipe gallery body comprises a first prefabricated part and a second prefabricated part which are arranged up and down; first hanging plates arranged in the direction close to the second prefabricated part are arranged at the two ends of the first prefabricated part correspondingly; second hanging plates arranged in the direction close to the first prefabricated part are arranged at the two ends of the second prefabricated part correspondingly; each first hanging plate is connected with the corresponding second hanging plate in a hanging manner; a vertically-arranged partition piece is arranged in the pipe gallery body; and the two ends of the partition piece abut against the first prefabricated part and the second prefabricated part correspondingly. The prefabricated comprehensive pipe gallery has the effect that comprehensive pipe gallery splicing can be conveniently completed in a time-saving and labor-saving manner.
本申请涉及一种拼接较为稳固的预制综合管廊,涉及城市地下建筑的领域,包括管廊本体,管廊本体包括上下设置的第一预制件和第二预制件,所述第一预制件的两端分别设有朝靠近第二预制件的方向设置的第一挂接板,所述第二预制件的两端分别设有朝靠近第一预制件的方向设置的第二挂接板,每个第一挂接板分别与相应的第二挂接板挂接,管廊本体内设有竖向设置的分隔件,分隔件的两端分别抵紧第一预制件和第二预制件。本申请具有便于较为省时省力的完成综合管廊拼接的效果。
Prefabricated comprehensive pipe gallery stable in splicing
The invention relates to a prefabricated comprehensive pipe gallery stable in splicing, and relates to the field of urban underground buildings. The prefabricated comprehensive pipe gallery comprises a pipe gallery body; the pipe gallery body comprises a first prefabricated part and a second prefabricated part which are arranged up and down; first hanging plates arranged in the direction close to the second prefabricated part are arranged at the two ends of the first prefabricated part correspondingly; second hanging plates arranged in the direction close to the first prefabricated part are arranged at the two ends of the second prefabricated part correspondingly; each first hanging plate is connected with the corresponding second hanging plate in a hanging manner; a vertically-arranged partition piece is arranged in the pipe gallery body; and the two ends of the partition piece abut against the first prefabricated part and the second prefabricated part correspondingly. The prefabricated comprehensive pipe gallery has the effect that comprehensive pipe gallery splicing can be conveniently completed in a time-saving and labor-saving manner.
本申请涉及一种拼接较为稳固的预制综合管廊,涉及城市地下建筑的领域,包括管廊本体,管廊本体包括上下设置的第一预制件和第二预制件,所述第一预制件的两端分别设有朝靠近第二预制件的方向设置的第一挂接板,所述第二预制件的两端分别设有朝靠近第一预制件的方向设置的第二挂接板,每个第一挂接板分别与相应的第二挂接板挂接,管廊本体内设有竖向设置的分隔件,分隔件的两端分别抵紧第一预制件和第二预制件。本申请具有便于较为省时省力的完成综合管廊拼接的效果。
Prefabricated comprehensive pipe gallery stable in splicing
一种拼接较为稳固的预制综合管廊
LIU CHUANHAI (author)
2021-06-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underground waterproof fast-splicing prefabricated comprehensive pipe gallery
European Patent Office | 2020
|Pipe gallery prefabricated members and prefabricated comprehensive pipe gallery
European Patent Office | 2016
|Pipe gallery prefabricated member and assembled comprehensive pipe gallery
European Patent Office | 2016
|