Fabricated building constructional column and construction method thereof
The invention relates to the technical field of constructional columns, and particularly relates to a fabricated building constructional column and a construction method thereof. The fabricated building constructional column comprises a first formwork and a second formwork which are mounted on a wall body, wherein a plurality of pouring openings are formed in the first formwork in the height direction of the first formwork, and the pouring opening in the uppermost portion is located in the top of the first formwork; and concrete is poured from the pouring opening in the lowermost portion firstly, when the depth of the poured concrete reaches the position of the adopted pouring opening, the currently poured pouring opening is blocked, and then pouring of all the pouring openings is completed upwards in sequence. The fabricated building constructional column and the construction method thereof have the effect of reducing the labor intensity of the constructional column in the construction process.
本申请涉及一种构造柱的技术领域,尤其是涉及一种装配式建筑构造柱及其施工方法,其包括在墙体上安装第一模板和第二模板,第一模板上沿着第一模板的高度方向开设有多个浇筑口,最上方的所述浇筑口位于第一模板的顶部,先从最下方的浇筑口内浇筑混凝土,浇筑混凝土的深度达到所采用的浇筑口位置时,对当前所浇筑的浇筑口封堵,然后再依次向上并完成所有的浇筑口的浇筑。本申请具有降低构造柱在施工过程中的劳动强度的效果。
Fabricated building constructional column and construction method thereof
The invention relates to the technical field of constructional columns, and particularly relates to a fabricated building constructional column and a construction method thereof. The fabricated building constructional column comprises a first formwork and a second formwork which are mounted on a wall body, wherein a plurality of pouring openings are formed in the first formwork in the height direction of the first formwork, and the pouring opening in the uppermost portion is located in the top of the first formwork; and concrete is poured from the pouring opening in the lowermost portion firstly, when the depth of the poured concrete reaches the position of the adopted pouring opening, the currently poured pouring opening is blocked, and then pouring of all the pouring openings is completed upwards in sequence. The fabricated building constructional column and the construction method thereof have the effect of reducing the labor intensity of the constructional column in the construction process.
本申请涉及一种构造柱的技术领域,尤其是涉及一种装配式建筑构造柱及其施工方法,其包括在墙体上安装第一模板和第二模板,第一模板上沿着第一模板的高度方向开设有多个浇筑口,最上方的所述浇筑口位于第一模板的顶部,先从最下方的浇筑口内浇筑混凝土,浇筑混凝土的深度达到所采用的浇筑口位置时,对当前所浇筑的浇筑口封堵,然后再依次向上并完成所有的浇筑口的浇筑。本申请具有降低构造柱在施工过程中的劳动强度的效果。
Fabricated building constructional column and construction method thereof
一种装配式建筑构造柱及其施工方法
MA JIANPING (author) / QI YUNLONG (author) / ZHOU ZHAN (author) / WANG SHEN (author) / ZHANG YANZHEN (author) / LIANG MINGCHU (author) / DAN XINPAN (author) / LI XUEPING (author)
2021-06-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction formwork and construction method of fabricated constructional column
European Patent Office | 2023
|Constructional column construction method and constructional column mold
European Patent Office | 2021
|European Patent Office | 2023
|