A platform for research: civil engineering, architecture and urbanism
Building formwork connecting structure for civil engineering
The invention discloses a building formwork connecting structure for civil engineering. The building formwork connecting structure comprises a first formwork body, a pouring groove, a first partition, a second formwork body, a second partition, a slot, a connecting limiting mechanism and an interval jacking mechanism. According to the building formwork connecting structure, the connecting limiting mechanism is arranged on the left end of the first formwork body, a jacking block and a sliding rod are embedded into the inner side of the slot, after the jacking block is embedded into the inner side of a limiting groove, a limiting rod and the limiting groove are buckled with each other, then the sliding rod is driven to move to the right end by a push rod, and the limiting rod is tightly attached to the inner wall of the limiting groove, so that the advantage that the first formwork body and the second formwork body can be rapidly connected with each other is achieved; and the interval jacking mechanism is arranged on the upper end of the first formwork body, and a certain distance can be kept between the first formwork body and the second formwork body through the jacking block, so that the effect that the first formwork body and the second formwork body can be stably fixed is achieved.
本发明公开了一种土木工程用建筑模板连接结构,包括第一模板本体、浇筑槽、第一隔板、第二模板本体、第二隔板、插槽、连接限位机构和间隔顶撑机构,本发明通过在第一模板本体左端设置了连接限位机构,将顶块和滑杆嵌入于插槽内侧,当顶块嵌入到限位槽内侧后,会使限位杆与限位槽相互扣接,随后通过推杆带动滑杆往右端移动,使限位杆与限位槽内壁紧密贴合,达到了能够快速对第一模板本体与第二模板本体相互连接的优点;通过在第一模板本体上端设置了间隔顶撑机构,通过顶撑块能够使第一模板本体与第二模板本体之间保持一定的间距,达到了能够使第一模板本体与第二模板本体平稳固定的作用。
Building formwork connecting structure for civil engineering
The invention discloses a building formwork connecting structure for civil engineering. The building formwork connecting structure comprises a first formwork body, a pouring groove, a first partition, a second formwork body, a second partition, a slot, a connecting limiting mechanism and an interval jacking mechanism. According to the building formwork connecting structure, the connecting limiting mechanism is arranged on the left end of the first formwork body, a jacking block and a sliding rod are embedded into the inner side of the slot, after the jacking block is embedded into the inner side of a limiting groove, a limiting rod and the limiting groove are buckled with each other, then the sliding rod is driven to move to the right end by a push rod, and the limiting rod is tightly attached to the inner wall of the limiting groove, so that the advantage that the first formwork body and the second formwork body can be rapidly connected with each other is achieved; and the interval jacking mechanism is arranged on the upper end of the first formwork body, and a certain distance can be kept between the first formwork body and the second formwork body through the jacking block, so that the effect that the first formwork body and the second formwork body can be stably fixed is achieved.
本发明公开了一种土木工程用建筑模板连接结构,包括第一模板本体、浇筑槽、第一隔板、第二模板本体、第二隔板、插槽、连接限位机构和间隔顶撑机构,本发明通过在第一模板本体左端设置了连接限位机构,将顶块和滑杆嵌入于插槽内侧,当顶块嵌入到限位槽内侧后,会使限位杆与限位槽相互扣接,随后通过推杆带动滑杆往右端移动,使限位杆与限位槽内壁紧密贴合,达到了能够快速对第一模板本体与第二模板本体相互连接的优点;通过在第一模板本体上端设置了间隔顶撑机构,通过顶撑块能够使第一模板本体与第二模板本体之间保持一定的间距,达到了能够使第一模板本体与第二模板本体平稳固定的作用。
Building formwork connecting structure for civil engineering
一种土木工程用建筑模板连接结构
CHEN XUEFENG (author)
2021-07-02
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building formwork connecting frame for civil engineering
European Patent Office | 2020
|Civil engineering connecting device facilitating formwork installation
European Patent Office | 2022
|Connecting structure of civil structure prefabricated formwork
European Patent Office | 2024
|