A platform for research: civil engineering, architecture and urbanism
Building construction method of inner wall surface
The invention relates to the technical field of wall surface construction, in particular to a building construction method of an inner wall surface. The method comprises the following steps that (a), dust on a wall surface is removed; (b), the cleaned dust is collected; and (c), the wall surface subjected to dust removal is wetted, a supporting frame comprises a bearing frame plate, a polishing plate and a hollow gear shaft, the polishing plate is fixedly connected to the front end of the bearing frame plate, polishing protrusions II are arranged on the polishing plate, the hollow gear shaft is fixedly connected to the bearing frame plate, a rotating cavity is rotationally connected with the bearing frame plate, a wetting component comprises a wetting cavity, an end sealing plate, a bevel gear II, an adding curved pipe, a water storage barrel and a water leakage hole, the wetting cavity is designed to be of a hollow structure, a plurality of through holes are evenly formed in the wetting cavity, sponge adheres to the outer surface of the wetting cavity, and the outer end of the wetting cavity is fixedly connected with the end sealing plate.
本发明涉及墙面施工技术领域,更具体的说是一种内墙面的建筑施工方法,一种内墙面的建筑施工方法,包括以下步骤;(a)将墙面上的灰尘处理掉;(b)对清理下的灰尘进行收集;(c)对清灰完毕的墙面进行润湿,所述的支撑架包括承载框板、打磨板和空心齿轮轴,承载框板的前端固定连接有打磨板,打磨板上设置有打磨凸起II,承载框板上固定连接有空心齿轮轴,转动腔与承载框板转动连接,所述的润湿构件包括润湿腔、端封板、锥齿轮II、添加曲管、存水桶和漏水孔,润湿腔为空心结构设计,润湿腔上均匀设置有多个通孔,润湿腔的外表面粘贴有海绵,润湿腔的外端固定连接有端封板。
Building construction method of inner wall surface
The invention relates to the technical field of wall surface construction, in particular to a building construction method of an inner wall surface. The method comprises the following steps that (a), dust on a wall surface is removed; (b), the cleaned dust is collected; and (c), the wall surface subjected to dust removal is wetted, a supporting frame comprises a bearing frame plate, a polishing plate and a hollow gear shaft, the polishing plate is fixedly connected to the front end of the bearing frame plate, polishing protrusions II are arranged on the polishing plate, the hollow gear shaft is fixedly connected to the bearing frame plate, a rotating cavity is rotationally connected with the bearing frame plate, a wetting component comprises a wetting cavity, an end sealing plate, a bevel gear II, an adding curved pipe, a water storage barrel and a water leakage hole, the wetting cavity is designed to be of a hollow structure, a plurality of through holes are evenly formed in the wetting cavity, sponge adheres to the outer surface of the wetting cavity, and the outer end of the wetting cavity is fixedly connected with the end sealing plate.
本发明涉及墙面施工技术领域,更具体的说是一种内墙面的建筑施工方法,一种内墙面的建筑施工方法,包括以下步骤;(a)将墙面上的灰尘处理掉;(b)对清理下的灰尘进行收集;(c)对清灰完毕的墙面进行润湿,所述的支撑架包括承载框板、打磨板和空心齿轮轴,承载框板的前端固定连接有打磨板,打磨板上设置有打磨凸起II,承载框板上固定连接有空心齿轮轴,转动腔与承载框板转动连接,所述的润湿构件包括润湿腔、端封板、锥齿轮II、添加曲管、存水桶和漏水孔,润湿腔为空心结构设计,润湿腔上均匀设置有多个通孔,润湿腔的外表面粘贴有海绵,润湿腔的外端固定连接有端封板。
Building construction method of inner wall surface
一种内墙面的建筑施工方法
LI HONGYAN (author)
2021-07-09
Patent
Electronic Resource
Chinese
Decoration construction method for inner wall surface of building
European Patent Office | 2022
|Building inner wall decoration construction device and construction method
European Patent Office | 2023
|Construction method for plastering inner wall of building
European Patent Office | 2023
|Construction method of inner wall of eco-friendly building and inner wall structure thereof
European Patent Office | 2022
|