A platform for research: civil engineering, architecture and urbanism
Bridge deck baffle structure
The invention belongs to the technical field of rail transit and relates to a bridge deck baffle structure. The bridge deck baffle structure comprises arc plates, a base, a top plate and stand columns; each arc plate comprises a first arc surface and a second arc surface; the first arc surface is arranged on the outer side of the arc plate; the second arc surface is arranged on the inner side of the arc plate; the arc shape of the first arc surface is consistent with that of the second arc surface; the base is arranged at the bottoms of the second arc surfaces; the top plate is arranged at the tops of the second arc surfaces; each stand column comprises a third arc surface, the third arc surface is arranged on the outer side of the stand column, and the third arc surface is consistent with the first arc surface; the number of the arc plates and the number of the stand columns are both multiple, and the arc plates and the stand columns are arranged at intervals. The base design is adopted, the base of the baffle is consistent with a beam body connection mode, the problem that the pre-buried position of a bridge deck steel bar deviates can be avoided, installation and positioning are convenient, and a breast board is more convenient and flexible to adjust.
本发明涉及轨道交通技术领域,具体而言,涉及一种桥面挡板结构。所述桥面挡板结构包括弧板,所述弧板包括第一弧面和第二弧面,所述第一弧面设置在所述弧板外侧,所述第二弧面设置在所述弧板内侧,所述第一弧面和所述第二弧面的弧形一致;底座,所述底座设置在所述第二弧面的底部;顶板,所述顶板设置在所述第二弧面的顶部;以及立柱,所述立柱包括第三弧面,所述第三弧面设置在所述立柱外侧,所述第三弧面与所述第一弧面设置一致;所述弧板和所述立柱均设置为多个,所述弧板与所述立柱间隔设置。本发明采用底座设计,挡板底座与梁体连接形式保持一致,可以避免桥面钢筋预埋位置存在偏差的问题,便于安装定位,并使得栏板的调整更加方便灵活。
Bridge deck baffle structure
The invention belongs to the technical field of rail transit and relates to a bridge deck baffle structure. The bridge deck baffle structure comprises arc plates, a base, a top plate and stand columns; each arc plate comprises a first arc surface and a second arc surface; the first arc surface is arranged on the outer side of the arc plate; the second arc surface is arranged on the inner side of the arc plate; the arc shape of the first arc surface is consistent with that of the second arc surface; the base is arranged at the bottoms of the second arc surfaces; the top plate is arranged at the tops of the second arc surfaces; each stand column comprises a third arc surface, the third arc surface is arranged on the outer side of the stand column, and the third arc surface is consistent with the first arc surface; the number of the arc plates and the number of the stand columns are both multiple, and the arc plates and the stand columns are arranged at intervals. The base design is adopted, the base of the baffle is consistent with a beam body connection mode, the problem that the pre-buried position of a bridge deck steel bar deviates can be avoided, installation and positioning are convenient, and a breast board is more convenient and flexible to adjust.
本发明涉及轨道交通技术领域,具体而言,涉及一种桥面挡板结构。所述桥面挡板结构包括弧板,所述弧板包括第一弧面和第二弧面,所述第一弧面设置在所述弧板外侧,所述第二弧面设置在所述弧板内侧,所述第一弧面和所述第二弧面的弧形一致;底座,所述底座设置在所述第二弧面的底部;顶板,所述顶板设置在所述第二弧面的顶部;以及立柱,所述立柱包括第三弧面,所述第三弧面设置在所述立柱外侧,所述第三弧面与所述第一弧面设置一致;所述弧板和所述立柱均设置为多个,所述弧板与所述立柱间隔设置。本发明采用底座设计,挡板底座与梁体连接形式保持一致,可以避免桥面钢筋预埋位置存在偏差的问题,便于安装定位,并使得栏板的调整更加方便灵活。
Bridge deck baffle structure
一种桥面挡板结构
ZHANG FUBIN (author) / LI HUI (author) / DENG YUNQING (author) / XUE HONGWEI (author) / XU SHENGQIAO (author) / LI SHENGQIANG (author)
2021-07-09
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2024
|BRIDGE DECK WATERPROOFING STRUCTURE AND BRIDGE DECK WATERPROOFING CONSTRUCTION METHOD
European Patent Office | 2024
|Bridge deck pavement structure and method for steel bridge deck slab
European Patent Office | 2015
|