A platform for research: civil engineering, architecture and urbanism
Corrugated steel pipe gallery based on prestressed tendons
The invention discloses a corrugated steel pipe gallery based on prestressed tendons. The corrugated steel pipe gallery comprises a pipe gallery body and a concrete base layer, wherein the pipe gallery body is formed in a way that a plurality of unit pipe galleries which are arranged in sequence are combined, a group of outer protection plates and inner protection plates are arranged between every two adjacent unit pipe galleries, the concrete base layer is laid on the bottom surface of the pipe gallery body, and first embedded parts and second embedded parts are embedded in the concrete base layer. The corrugated steel pipe gallery has the beneficial effects that the plurality of unit pipe galleries with the sections of arc-shaped structures are arranged in sequence, so that the mounting edges on both sides of the plurality of unit pipe galleries are connected with the first embedded parts of the concrete base layer in an inserted mode through first mounting holes, then fixed plates on the inner side surfaces of the plurality of unit pipe galleries are connected with the second embedded parts of the concrete base layer in the inserted mode through third mounting holes, and second nuts which are in threaded connection with the ends of the first embedded parts and the second embedded parts are matched, so that the assembly type installation of the corrugated steel pipe gallery is realized, and compared with a traditional corrugated steel plate splicing installation mode, the installation efficiency of the pipe gallery is effectively improved.
本发明公开了一种基于预应力筋的波纹钢管廊,包括管廊本体和混凝土基层,所述管廊本体由多个依次排布的单元管廊组合而成,且相邻两个单元管廊之间设置有一组外防护板和内防护板,所述管廊本体的底面铺设有混凝土基层,且混凝土基层内嵌入第一预埋件和第二预埋件。有益效果:本发明通过将多个截面为弧型结构的单元管廊依次排布,促使多个单元管廊两侧的安装边通过第一安装孔与混凝土基层的第一预埋件插接,进而多个单元管廊内侧面的固定板通过第三安装孔与混凝土基层的第二预埋件插接,配合第一预埋件和第二预埋件端部螺纹连接的第二螺母,实现波纹钢管廊的装配式安装,相较于传统波纹钢板拼接安装的方式,有效提升管廊的安装效率。
Corrugated steel pipe gallery based on prestressed tendons
The invention discloses a corrugated steel pipe gallery based on prestressed tendons. The corrugated steel pipe gallery comprises a pipe gallery body and a concrete base layer, wherein the pipe gallery body is formed in a way that a plurality of unit pipe galleries which are arranged in sequence are combined, a group of outer protection plates and inner protection plates are arranged between every two adjacent unit pipe galleries, the concrete base layer is laid on the bottom surface of the pipe gallery body, and first embedded parts and second embedded parts are embedded in the concrete base layer. The corrugated steel pipe gallery has the beneficial effects that the plurality of unit pipe galleries with the sections of arc-shaped structures are arranged in sequence, so that the mounting edges on both sides of the plurality of unit pipe galleries are connected with the first embedded parts of the concrete base layer in an inserted mode through first mounting holes, then fixed plates on the inner side surfaces of the plurality of unit pipe galleries are connected with the second embedded parts of the concrete base layer in the inserted mode through third mounting holes, and second nuts which are in threaded connection with the ends of the first embedded parts and the second embedded parts are matched, so that the assembly type installation of the corrugated steel pipe gallery is realized, and compared with a traditional corrugated steel plate splicing installation mode, the installation efficiency of the pipe gallery is effectively improved.
本发明公开了一种基于预应力筋的波纹钢管廊,包括管廊本体和混凝土基层,所述管廊本体由多个依次排布的单元管廊组合而成,且相邻两个单元管廊之间设置有一组外防护板和内防护板,所述管廊本体的底面铺设有混凝土基层,且混凝土基层内嵌入第一预埋件和第二预埋件。有益效果:本发明通过将多个截面为弧型结构的单元管廊依次排布,促使多个单元管廊两侧的安装边通过第一安装孔与混凝土基层的第一预埋件插接,进而多个单元管廊内侧面的固定板通过第三安装孔与混凝土基层的第二预埋件插接,配合第一预埋件和第二预埋件端部螺纹连接的第二螺母,实现波纹钢管廊的装配式安装,相较于传统波纹钢板拼接安装的方式,有效提升管廊的安装效率。
Corrugated steel pipe gallery based on prestressed tendons
一种基于预应力筋的波纹钢管廊
MA YAWEI (author) / GUO GUIHONG (author) / WANG JIAN (author) / CHEN YANGFAN (author)
2021-07-09
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
British Library Online Contents | 2015
|Construction method of corrugated steel comprehensive pipe gallery
European Patent Office | 2020
|