A platform for research: civil engineering, architecture and urbanism
Wall formwork, wall formwork frame and elevation positioning method of wall formwork
The invention discloses a wall formwork, a wall formwork frame and an elevation positioning method of the wall formwork. The wall formwork comprises a plate body and a first side rib, and the first side rib is arranged on the plate body; and a marking structure arranged along a straight line is formed on the surface of the plate body, and the marking structure and the first edge rib are located on the same side of the plate body. By means of the arrangement mode, the marking structure can play a role of an elevation line, in the elevation positioning process, the height of the wall formwork is adjusted so that a datum line projected through elevation equipment can coincide with the marking structure, then the wall formwork is fixed, therefore elevation positioning of the wall formwork is completed, the elevation positioning mode is higher in precision, and the workload of workers is reduced, so that the workers do not need to draw elevation lines on site, and the working efficiency is improved.
一种墙模板、墙模板框架及墙模板的标高定位方法,其中,该墙模板包括板体和第一边肋,第一边肋设置在板体上;板体的表面上成型有沿一直线布置的标记结构,标记结构与第一边肋位于板体的同一侧。这样的设置方式,使得标记结构便能够起到标高线的功能,在标高定位的过程中,通过调节墙模板的高度,以使标高设备投射出的基准线与标记结构重合,再固定墙模板,从而完成墙模板的标高定位,这种标高定位的方式精度更高,减少了工作人员的工作量,使得工作人员不需要在现场画标高线,提高了工作效率。
Wall formwork, wall formwork frame and elevation positioning method of wall formwork
The invention discloses a wall formwork, a wall formwork frame and an elevation positioning method of the wall formwork. The wall formwork comprises a plate body and a first side rib, and the first side rib is arranged on the plate body; and a marking structure arranged along a straight line is formed on the surface of the plate body, and the marking structure and the first edge rib are located on the same side of the plate body. By means of the arrangement mode, the marking structure can play a role of an elevation line, in the elevation positioning process, the height of the wall formwork is adjusted so that a datum line projected through elevation equipment can coincide with the marking structure, then the wall formwork is fixed, therefore elevation positioning of the wall formwork is completed, the elevation positioning mode is higher in precision, and the workload of workers is reduced, so that the workers do not need to draw elevation lines on site, and the working efficiency is improved.
一种墙模板、墙模板框架及墙模板的标高定位方法,其中,该墙模板包括板体和第一边肋,第一边肋设置在板体上;板体的表面上成型有沿一直线布置的标记结构,标记结构与第一边肋位于板体的同一侧。这样的设置方式,使得标记结构便能够起到标高线的功能,在标高定位的过程中,通过调节墙模板的高度,以使标高设备投射出的基准线与标记结构重合,再固定墙模板,从而完成墙模板的标高定位,这种标高定位的方式精度更高,减少了工作人员的工作量,使得工作人员不需要在现场画标高线,提高了工作效率。
Wall formwork, wall formwork frame and elevation positioning method of wall formwork
墙模板、墙模板框架及墙模板的标高定位方法
LIU JIANCHUN (author) / LI JIAN (author) / ZENG ZHENG (author) / YUAN WANGXIAN (author) / HU YUEGEN (author) / ZHANG LIMING (author)
2021-07-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste