Riverway revetment reinforcing construction method
The invention relates to the field of revetment reinforcement, in particular to a riverway revetment reinforcing construction method. The riverway revetment reinforcing construction method comprises the following steps that S1, planning is carried out before construction; S2, preparation is carried out before construction; S3, a cofferdam is built; S4, river water and sludge are cleaned; S5, an original riverway revetment is cleaned; S6, a supporting formwork is installed; S7, a reinforcing platform is built; and S8, the formwork and the cofferdam are removed. In the process of drawing the topographic map of the riverway revetment, the damage degree of the riverway revetment is classified and marked, and the classification marks are added to the derived three-dimensional model of the riverway revetment, so that riverway revetment designers can reinforce different parts of the riverway revetment to different degrees; and the reinforcement effect of the riverway revetment is improved, and meanwhile, the planning rationality of the riverway revetment is improved.
本申请涉及驳岸加固的领域,尤其是涉及一种河道驳岸加固施工方法,其包括以下步骤:S1、施工前的规划;S2、施工前的准备;S3、围堰的修建;S4、河水和淤泥清理;S5、原有河道驳岸的清理;S6、支撑模板安装;S7、加固平台的修建;S8、拆除模板及围堰。本申请在河道驳岸绘制地形图过程中,对河道驳岸的损坏程度进行分类标记,并在导出的河道驳岸三维立体模型添加分类标记,便于河道驳岸设计人员对河道驳岸不同部位进行不同程度的加固,提升了河道驳岸的加固效果,同时提升了河道驳岸的规划的合理性。
Riverway revetment reinforcing construction method
The invention relates to the field of revetment reinforcement, in particular to a riverway revetment reinforcing construction method. The riverway revetment reinforcing construction method comprises the following steps that S1, planning is carried out before construction; S2, preparation is carried out before construction; S3, a cofferdam is built; S4, river water and sludge are cleaned; S5, an original riverway revetment is cleaned; S6, a supporting formwork is installed; S7, a reinforcing platform is built; and S8, the formwork and the cofferdam are removed. In the process of drawing the topographic map of the riverway revetment, the damage degree of the riverway revetment is classified and marked, and the classification marks are added to the derived three-dimensional model of the riverway revetment, so that riverway revetment designers can reinforce different parts of the riverway revetment to different degrees; and the reinforcement effect of the riverway revetment is improved, and meanwhile, the planning rationality of the riverway revetment is improved.
本申请涉及驳岸加固的领域,尤其是涉及一种河道驳岸加固施工方法,其包括以下步骤:S1、施工前的规划;S2、施工前的准备;S3、围堰的修建;S4、河水和淤泥清理;S5、原有河道驳岸的清理;S6、支撑模板安装;S7、加固平台的修建;S8、拆除模板及围堰。本申请在河道驳岸绘制地形图过程中,对河道驳岸的损坏程度进行分类标记,并在导出的河道驳岸三维立体模型添加分类标记,便于河道驳岸设计人员对河道驳岸不同部位进行不同程度的加固,提升了河道驳岸的加固效果,同时提升了河道驳岸的规划的合理性。
Riverway revetment reinforcing construction method
一种河道驳岸加固施工方法
GUI TENGFEI (author)
2021-07-13
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Microbial improved riverway revetment device and construction method
European Patent Office | 2021
|Riverway revetment stone prepared from riverway dredging sludge and preparation method thereof
European Patent Office | 2020
|