A platform for research: civil engineering, architecture and urbanism
Air pipe installation construction method applied to high-rise building
The invention discloses an air pipe installation construction method applied to a high-rise building. The method comprises the following specific steps: construction preparation, air pipe acceptance and transportation, air pipe transfer, hanging bracket positioning and installation, air pipe cleaning and installation, air pipe leveling and alignment, equipment and butterfly valve installation, inspection and pilot operation, and delivery evaluation. The problems in the prior art that most of hanging brackets of air pipes are of fixed structures, the air pipes are difficult to move after being installed on the hanging brackets, later leveling and alignment of the air pipes are inconvenient, the installation efficiency of the air pipes is affected, and the hanging brackets in the prior art are also inconvenient to assemble and fix are solved and by improving and optimizing the air pipe installation construction method, the air pipes can be conveniently leveled and aligned through the hanging brackets after the air pipes are installed, the air pipes can be conveniently, rapidly and effectively installed, the installation construction efficiency of the air pipes are effectively improved, and meanwhile the hanging brackets of the air pipes used in the method is convenient to assemble and adjust.
本发明公开了一种应用于高层建筑的风管安装施工方法,所述风管的安装施工方法具体步骤包括施工准备、风管验收与运输、风管转运、吊架定位安装、吊架定位安装、风管清理和安装、风管找平找正、设备和蝶阀安装、检验和试运行和交付评估,本发明解决现有风管的吊架多为固定结构,导致风管安装在吊架上后难以活动,进而导致风管后期找平找正不方便,导致影响风管的安装效率,且现有的吊架也不便于组装和固定的问题,通过对风管安装施工方法进行改良和优化,使得风管安装后方便通过吊架对风管进行找平找正,便于快速有效的对风管进行安装,有效的提高了风管安装施工效率,同时该方法使用的风管吊架方便组装和调节。
Air pipe installation construction method applied to high-rise building
The invention discloses an air pipe installation construction method applied to a high-rise building. The method comprises the following specific steps: construction preparation, air pipe acceptance and transportation, air pipe transfer, hanging bracket positioning and installation, air pipe cleaning and installation, air pipe leveling and alignment, equipment and butterfly valve installation, inspection and pilot operation, and delivery evaluation. The problems in the prior art that most of hanging brackets of air pipes are of fixed structures, the air pipes are difficult to move after being installed on the hanging brackets, later leveling and alignment of the air pipes are inconvenient, the installation efficiency of the air pipes is affected, and the hanging brackets in the prior art are also inconvenient to assemble and fix are solved and by improving and optimizing the air pipe installation construction method, the air pipes can be conveniently leveled and aligned through the hanging brackets after the air pipes are installed, the air pipes can be conveniently, rapidly and effectively installed, the installation construction efficiency of the air pipes are effectively improved, and meanwhile the hanging brackets of the air pipes used in the method is convenient to assemble and adjust.
本发明公开了一种应用于高层建筑的风管安装施工方法,所述风管的安装施工方法具体步骤包括施工准备、风管验收与运输、风管转运、吊架定位安装、吊架定位安装、风管清理和安装、风管找平找正、设备和蝶阀安装、检验和试运行和交付评估,本发明解决现有风管的吊架多为固定结构,导致风管安装在吊架上后难以活动,进而导致风管后期找平找正不方便,导致影响风管的安装效率,且现有的吊架也不便于组装和固定的问题,通过对风管安装施工方法进行改良和优化,使得风管安装后方便通过吊架对风管进行找平找正,便于快速有效的对风管进行安装,有效的提高了风管安装施工效率,同时该方法使用的风管吊架方便组装和调节。
Air pipe installation construction method applied to high-rise building
一种应用于高层建筑的风管安装施工方法
LI HAOYUAN (author) / XU YUANYI (author) / LIU TAO (author) / WU SENHAO (author)
2021-07-13
Patent
Electronic Resource
Chinese
Air pipe transportation and installation equipment applied to high-rise building
European Patent Office | 2024
|High-rise building curtain wall glass installation construction method
European Patent Office | 2021
|Pipe installation in building construction
Engineering Index Backfile | 1931
High-rise building external wall drainage pipe connection and installation equipment
European Patent Office | 2020
|Construction and installation method for super high-rise building steel structure
European Patent Office | 2021
|